PRODUCT SKU : SM811K01 3BSE018173R1

PRODUCT TYPE : Safety CPU Modules

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The ABB SM811K01 3BSE018173R1, also cataloged as the SM811K01 Safety CPU Module, operates as a dedicated hardware component for high-integrity safety processing and SIL3 execution within System 800xA architecture platforms.

Hardware Specifications

Parameter Specification
Model SM811K01
Order Code 3BSE018173R1
Brand ABB
Origin Sweden
Weight 0.6 kg
Dimensions (D x H x W) 127.5 mm x 185 mm x 59 mm
Operating Temp 0 to 55 deg C
Power Consumption System backplane powered
Module Included SM811 Safety Module
Baseplate Included TP868 Baseplate
Cable Included TK852V10 Synchronization Link Cable
Safety Rating SIL3 certified
Bus Interface CEX bus connection via BC810
Battery Count 0
Compliance Not RoHS 2 compliant (restricted to pre-July 22 2017 legacy systems)

Firmware Flash Compatibility & Controller Synchronization

The SM811 safety module collaborates directly with the PM865 CPU to establish a deterministic safety processing environment. Inter-module communication relies on dedicated synchronization signals transferred over the TK852V10 synchronization link cable, while electrical integration into the system communication expansion lane requires connection to the CEX bus downstream of a BC810 CEX bus interconnection unit. The internal hardware logic enforces lockstep firmware flash compatibility with the primary PM865 execution engine, preventing diagnostic mismatch conditions and ensuring fault-tolerant fail-safe state execution under safe-state trigger parameters.

Frequently Asked Questions

Q: Can the SM811K01 safety CPU module be deployed in new greenfield installations?

A: No. Due to RoHS 2 2011/65/EU non-compliance, the SM811K01 is designated strictly as a spare part for existing systems placed on the market prior to July 22, 2017, meant solely for repair, maintenance, or capacity expansion.

Q: How does the SM811K01 establish physical connection with the PM865 controller?

A: The SM811 module seats on the included TP868 baseplate, connects to the primary CEX bus via the BC810 CEX bus interconnection unit, and establishes high-speed processor synchronization using the TK852V10 link cable.

Field Installation Guidelines

  1. Power-Off Isolation: Always de-energize the cabinet power supply to the backplane prior to mounting or unseating the TP868 baseplate and SM811 processing unit.
  2. Bus Connections: Secure the BC810 CEX bus interconnection box properly before attaching the CEX bus interface to prevent signal integrity degradation along the communication lane.
  3. Cable Routing: Route the TK852V10 synchronization link cable avoiding tight bend radii or direct proximity to high-voltage AC field wiring to prevent electromagnetic interference.
  4. Grounding Protocol: Connect the baseplate shield connections directly to the cabinet functional earth ground bar using low-impedance grounding straps.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more