The Bailey NICS01, also cataloged as the NICS01 Controller Station Termination Unit, operates as a dedicated hardware component for field signal termination and operator station interface execution within ABB Infi 90 control networks. The unit terminates control station wiring assemblies, routing discrete and analog communication lines between operator interfaces and rack-mounted controller modules.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | NICS01 |
| Brand | Bailey (ABB) |
| Origin | United States |
| Weight | 0.7 lb (Gross) |
| Dimensions | Standard Module Dimensions |
| Operating Temp | Standard Industrial Operating Range |
| Power Consumption | Passive Termination Board Draw |
| Product Type | BAINET Termination Assembly |
| Application | Infi 90 Controller Station Termination |
| Tariff Code | 8537109170 |
Backplane Bus Communication Velocity & I/O Density Scaling
The NICS01 termination unit facilitates point-to-point signal routing to support system backplane bus communication velocity across Network 90 and Infi 90 sub-racks. Its direct termination architecture allows for optimized cabinet I/O density scaling by consolidating station wiring harnesses onto a centralized block. Handled with verified firmware flash compatibility across connected controller interfaces, the module maintains signal line impedance and minimizes cross-talk during rapid data exchange sequences.
Frequently Asked Questions
Q: How is field ground connection established on the NICS01 termination unit?
A: Ground connection is established via direct mechanical bonding screws that attach the unit base plate to the enclosure grounding rail.
Q: What system interface cables connect to the NICS01 board?
A: The board features dedicated multi-pin ribbon and terminal connections designed to interface directly with Infi 90 station modules and operator command units.
Q: Does the NICS01 require active power inputs for operation?
A: No. The NICS01 functions as a passive physical termination unit, routing power and signal lines directly from the system backplane and controller modules.
Field Installation Guidelines
Execute the following installation procedure inside the system cabinet:
- Sub-rack Mounting: Position the NICS01 unit onto the designated cabinet mounting rails and tighten securing screws to prevent movement under vibration.
- Shield Grounding: Connect all incoming cable drain wires and overall shields to the system ground bus bar using low-impedance clamps.
- Connector Engagement: Align the multi-pin interface cables from the controller module and firmly press until retaining clips snap into position.
- Wiring Verification: Confirm terminal tightness and verify point-to-point continuity prior to applying 24 VDC system loop power.
Additional Information
- 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
- 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
- 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
- Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
- Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
- Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.