Skip to content

What are you looking for?


You may also like

NKTU01-L7 ABB Termination Unit CableNKTU01-L7 ABB Termination Unit CableNKTU01-L7 ABB Termination Unit Cable
NKTU01-L7 ABB Termination Unit Cable
NKTU01-L7 ABB Termination Unit Cable
NKTU01-L7 ABB Termination Unit Cable

NKTU01-L7 ABB Termination Unit Cable


Only 10 left - Selling fast

PRODUCT SKU : NKTU01-L7

PRODUCT TYPE : I/O Cables

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The ABB NKTU01-L7, also cataloged as the NKTU01-L7 Termination Unit Cable, operates as a dedicated hardware component for low-loss signal transmission between controller I/O modules and termination units within ABB Bailey Infi 90 DCS platforms.

Hardware Specifications

Parameter Specification
Model NKTU01-L7
Brand ABB
Origin USA / Sweden / Canada
Dimensions Standard 2.13 m length cable profile
Operating Temp -40 deg C to +80 deg C
Power Consumption Passive cable assembly (no power draw)
Cable Type Termination Unit Cable
Cable Length 2.13 m (7 ft)
Voltage Rating Up to 300 V
Insulation Material PVC (Polyvinyl Chloride)
Supported Protocols RS-232-C, RS-485
Shielding EMI protection layer

Deterministic Network Backplane and System Signal Integrity

The NKTU01-L7 cable assembly provides structured multi-conductor connections between rack-mounted I/O modules and field termination assemblies. Supporting both RS-232-C and RS-485 serial communication, the optimized copper wire pairs maintain signal integrity and backplane bus communication velocity across subrack routing paths.

Operating as a completely passive cable assembly, the unit ensures full firmware flash compatibility across all supported Bailey Infi 90 processor and interface module revisions. Integrated EMI shielding and PVC insulation protect serial differential signals against industrial electrical noise and external electromagnetic interference.

Frequently Asked Questions

Q: Does the NKTU01-L7 cable assembly require power from the system rack?

A: No, the NKTU01-L7 is a passive signal conduit that connects hardware interfaces directly without consuming electrical power.

Q: What is the continuous voltage rating for the NKTU01-L7 assembly?

A: The PVC insulation and internal conductors are rated for continuous operation up to 300 V across an operating temperature range of -40 deg C to +80 deg C.

Q: Can the cable be disconnected while the parent I/O module remains powered?

A: Active field signal loops and external power feeds connected to the termination unit should be de-energized or isolated prior to disconnecting the cable to avoid signal transients.

Field Installation Guidelines

  • Isolate all external field power sources and signal loops on the termination unit prior to cable removal or attachment.
  • Wear a grounded anti-static wrist strap during handling to shield adjacent subrack modules from electrostatic discharge.
  • Route the 2.13-meter cable through cabinet wiring channels, observing minimum bend radius rules to avoid conductor strain.
  • Align cable connectors accurately with guide pins on the module and termination unit headers, pressing firmly until locking latches engage.
  • Secure strain relief retention clamps within the enclosure to prevent mechanical displacement from industrial cabinet vibration.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Instrumentation Control Systems in Modern Industrial Automation

Understanding Instrumentation Control Systems in Modern Industrial Automation

An instrumentation control system (ICS) serves as the central nervous system of modern manufacturing plants and processing facilities. Engineers classify these setups as Electrical, Electronic, or Programmable Electronic Systems (E/E/PES). In practice, an ICS bridges the physical world of industrial machinery with digital decision-making tools. Therefore, understanding its architecture is essential for anyone working in factory automation, process control, or plant safety.

Read more
Mastering Electrical Grounding Fundamentals in Industrial Automation and Control Systems

Mastering Electrical Grounding Fundamentals in Industrial Automation and Control Systems

Electrical grounding is a complex engineering discipline. It requires deep knowledge of soil composition and conductor materials. National Electrical Code (NEC) Article 250 outlines these requirements clearly. Many engineers confuse grounding, earthing, and bonding. Grounding connects circuits to a common reference point. Earthing specifically links equipment directly to the planet. Bonding permanently joins metallic parts to ensure electrical continuity.

Read more
Architectural Blueprint of Industrial Automation and Control Systems (IACS): Standards, Safety, and Remote Operations

Architectural Blueprint of Industrial Automation and Control Systems (IACS): Standards, Safety, and Remote Operations

According to IEC 62443, Industrial Automation and Control Systems (IACS) integrate personnel, hardware, and software. These components collectively influence the safety and reliability of any industrial process. Modern control systems allow extensive remote monitoring and operation. However, enabling remote capabilities introduces complex cybersecurity challenges. Therefore, facility operators must evaluate system functions carefully before expanding connectivity.

Read more