Skip to content

What are you looking for?


You may also like

ABB NKTT01-3 Termination CableABB NKTT01-3 Termination CableABB NKTT01-3 Termination Cable
ABB NKTT01-3 Termination Cable
ABB NKTT01-3 Termination Cable
ABB NKTT01-3 Termination Cable

ABB NKTT01-3 Termination Cable


Only 10 left - Selling fast

PRODUCT SKU : NKTT01-3

PRODUCT TYPE : Termination Cables

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for direct point-to-point interface connectivity between NTCL units in control system cabinets, the ABB NKTT01-3 (NKTT01-3 Termination Cable) provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model NKTT01-3
Brand ABB
Dimensions Cable Length: 12.7 m, Outer Diameter: 0.914 mm
Operating Temp -20 to 70 deg C
Power Consumption Passive component (0 W)
Cable Type Prefabricated Termination Cable
Primary Application Direct connection between NTCL modules
WEEE Category Product Not in WEEE Scope

Backplane Bus Communication Velocity and I/O Density Scaling

The NKTT01-3 prefabricated termination cable maintains signal integrity across high-speed bus interfaces without causing attenuation that compromises backplane bus communication velocity. Its factory-terminated conductors eliminate manual point-to-point wiring errors, supporting high I/O density scaling inside control enclosures. Standardized pinouts ensure full compatibility across connected rack assemblies while preserving low propagation delay during deterministic communication cycles.

Frequently Asked Questions

Q: What is the primary functional purpose of the NKTT01-3 termination cable?

A: The NKTT01-3 is a prefabricated cable engineered to establish a direct point-to-point signal link between NTCL termination units.

Q: Does the NKTT01-3 cable require external electrical power for operation?

A: No, the cable is a passive physical interconnection assembly and draws zero operational power.

Q: What physical precautions should be taken regarding the cable bend radius during panel installation?

A: Maintain a minimum static bend radius of 10 times the cable outer diameter to prevent internal conductor strain or signal degradation.

Field Installation Guidelines

  1. De-energize control power to the cabinet racks containing the target NTCL modules prior to cable routing.
  2. Inspect the pre-molded connectors at both ends of the NKTT01-3 cable for pin alignment and mechanical integrity.
  3. Route the cable through dedicated low-voltage wiring troughs, separating it from high-voltage AC power lines.
  4. Align and insert the connector housing into the first NTCL module port until the retention latch engages completely.
  5. Connect the opposing end to the secondary NTCL module port and secure any strain-relief hardware along the cable path.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Dry Contacts in PLC Wiring: An Industrial Automation Guide

Understanding Dry Contacts in PLC Wiring: An Industrial Automation Guide

Mastering contact switching principles is essential for reliable control panels. Field devices and PLCs interface through dry or wet contacts. This technical guide examines the mechanics of dry contacts, explores their wiring architectures, and evaluates their key advantages in industrial automation.

Read more
Ultimate Commissioning Checklist for Industrial Automation Systems: An Engineering Guide

Ultimate Commissioning Checklist for Industrial Automation Systems: An Engineering Guide

Commissioning is the most decisive phase of an industrial automation project, transforming control hardware and software into an operational facility. Thorough testing prevents costly startup delays and builds customer confidence. This guide covers essential checklists, electrical standards, and best practices.

Read more
Redundant Automation Systems: Core Architecture, Business Value, and Technical Advantages

Redundant Automation Systems: Core Architecture, Business Value, and Technical Advantages

Unplanned downtime poses a major financial threat to process manufacturing. To prevent costly interruptions, engineers deploy redundant PLC and DCS architectures that ensure continuous operation when hardware fails. This technical guide explores redundancy principles, critical system nodes, and real-world scenarios.

Read more