Skip to content

What are you looking for?


You may also like

ABB DSTA 121 Connection Unit 57120001-EABB DSTA 121 Connection Unit 57120001-EABB DSTA 121 Connection Unit 57120001-E
ABB DSTA 121 Connection Unit 57120001-E
ABB DSTA 121 Connection Unit 57120001-E
ABB DSTA 121 Connection Unit 57120001-E

ABB DSTA 121 Connection Unit 57120001-E


Only 10 left - Selling fast

PRODUCT SKU : DSTA 121 57120001-E

PRODUCT TYPE : Connection Units

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for field wiring interface termination and signal transmission routing in ABB automation platforms, the ABB DSTA 121 57120001-E (DSTA 121 Connection Units) provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model DSTA 121
Part Number 57120001-E
Brand ABB
Product Type Connection Units
Origin Sweden
Weight 0.2 kg
Dimensions 200 mm x 100 mm x 20 mm
Operating Temp 0 to +55 deg C
Power Consumption Passive connection assembly (0 W)
Module Type Connection Unit

High I/O Density Scaling and Backplane Signal Integrity

The connection unit facilitates physical wire termination to organize field-side conductors before routing to I/O processing cards. Its internal bus traces preserve high backplane bus communication velocity and prevent signal distortion across high-density I/O configurations. Passive galvanic paths optimize signal continuity and firmware flash compatibility during controller-level data processing.

Frequently Asked Questions

Q: Does the DSTA 121 connection unit consume active backplane current?

A: No, the module operates as a passive wiring termination unit and consumes zero active backplane electrical power.

Q: How is shielding grounded when terminating field cables on the unit?

A: Cable shield braid wires must be clamped directly to the chassis earthing bar adjacent to the terminal block to maintain noise suppression limits.

Q: Can wiring be safely modified while field loops remain energized?

A: No, primary field loops must be isolated and power removed before altering connections to prevent transient arc faults or signal disruption.

Field Installation Guidelines

  1. Isolate all loop power supplies prior to making or modifying screw terminal connections.
  2. Align and secure the 0.2 kg unit onto its designated mounting DIN rail or rack subrack frame.
  3. Strip field cable insulation back 7 mm and secure conductors into the screw terminals to ensure full electrical contact.
  4. Clamp signal cable shields directly to the cabinet chassis grounding rail near the module entrance point.
  5. Maintain a minimum physical distance of 200 mm between low-voltage signal wiring on the DSTA 121 and 230 VAC/480 VAC power lines.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
The Shift to Flexible IO Modules in Modern Industrial Automation

The Shift to Flexible IO Modules in Modern Industrial Automation

Traditional control systems rely on dedicated Input Output (IO) cards for industrial automation. Each conventional module processes a single signal type, such as Digital Input (DI), Digital Output (DO), Analog Input (AI), or Analog Output (AO). A standard 16-channel card accepts only one specific channel type across all ports. This inflexible hardware design often creates severe engineering bottlenecks during project execution. Engineers frequently must install entirely new cards to accommodate a single extra sensor. Consequently, late design changes increase control cabinet space requirements and drive up project costs.

Read more
DCS Commissioning Steps in Industrial Automation Projects

DCS Commissioning Steps in Industrial Automation Projects

Commissioning a Distributed Control System (DCS) represents a crucial milestone when deploying modern process automation infrastructure. Field engineers must execute systematic verification steps to transition complex control hardware from static installation to dynamic plant control. Proper commissioning ensures that controllers, I/O modules, network switches, and HMI software operate in strict compliance with engineering design specifications before introducing live process fluids.

Read more
PLC and DCS Control System Spares Strategy: Engineering Guidelines

PLC and DCS Control System Spares Strategy: Engineering Guidelines

Modern factory automation relies on high-speed fiber optic backbones to link distributed control systems across noise-intensive industrial environments. Unlike copper wiring, optical fibers transmit data via light pulses, making them completely immune to electromagnetic interference (EMI). Field engineers must master optical cable joining and fusion splicing techniques to guarantee low-loss data transmission across critical Programmable Logic Controller (PLC) and Distributed Control System (DCS) nodes.

Read more