Skip to content

What are you looking for?


You may also like

TC570 3BSE001458R1 ABB Master Fieldbus Connection UnitTC570 3BSE001458R1 ABB Master Fieldbus Connection UnitTC570 3BSE001458R1 ABB Master Fieldbus Connection Unit
TC570 3BSE001458R1 ABB Master Fieldbus Connection Unit
TC570 3BSE001458R1 ABB Master Fieldbus Connection Unit
TC570 3BSE001458R1 ABB Master Fieldbus Connection Unit

TC570 3BSE001458R1 ABB Master Fieldbus Connection Unit


Only 10 left - Selling fast

PRODUCT SKU : TC570 3BSE001458R1

PRODUCT TYPE : Communication Modules

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The ABB 3BSE001458R1, also cataloged as the TC570 Master Fieldbus Connection Unit, operates as a dedicated hardware component for localized control logic execution within ABB Master Fieldbus system architectures. Configured for serial physical-layer termination and communication distribution, the assembly manages datagram routing between processing nodes and distributed substations to provide direct physical/electrical execution of real-time industrial protocols.

Hardware Specifications

Parameter Specification
Model TC570 (3BSE001458R1)
Brand ABB
Origin Sweden
Weight 0.75 kg
Dimensions 144 mm x 216 mm x 54 mm
Operating Temp 0 to +55 deg C (Standard baseline enclosure operational limits)
Power Consumption System bus termination dependent
Environmental Directives Following EU Directive 2011/65/EU (RoHS); WEEE Category 5
Number of Batteries 0
Product Type Communication Modules

Profinet / EtherNet/IP Deterministic Networks and I/O Density Scaling

The logic translation path inside the ABB TC570 3BSE001458R1 is clocked to prevent latency skewing across standard backplane bus communication velocity constraints. When bridging legacy Master Fieldbus data frames to higher-tier architectures via Profinet or EtherNet/IP deterministic networks, the module isolates noise and maintains continuous packet sequencing. During extensive system updates requiring high I/O density scaling, the unit handles structural configuration parameters without buffer congestion, provided the active nodes are verified against the host controller firmware flash compatibility benchmarks.

Frequently Asked Questions

Q: Is hot-swapping or unpowered termination manipulation supported on the TC570 unit during active execution?

A: No. The connection unit does not feature active isolation circuitry to permit live extraction or connection adjustments. Removing signal lines or unseating the module while the fieldbus network is live causes immediate frame errors, token dropouts, and potential electrical component degradation due to voltage reflections.

Q: How is a loss of fieldbus communication or packet drop diagnosed on this specific hardware module?

A: Diagnostic state registers must be scanned via the controller programming interface. If CRC errors or timeouts escalate, technicians must inspect physical line termination impedances, confirm the absence of ground loops, and check the unit baseline against the main system firmware flash compatibility checklist.

Field Installation Guidelines

  1. Electrostatic Discharge Minimization: Field engineers must wear a properly connected and grounded electrostatic discharge (ESD) wrist strap before handling terminal interfaces or internal circuit boards to avoid micro-circuit trace damage.
  2. Mechanical Mounting Fixation: Install the 0.75 kg enclosure firmly inside the control cabinet using specified mounting screws. Ensure the module is mechanically stable and that all local ground points bond directly to the enclosure frame backplate.
  3. Communication Line Segregation: Route all Master Fieldbus communication and network links within dedicated low-voltage wireways. Maintain a physical separation of at least 100 mm from high-voltage AC cables, motor control wires, and variable frequency drive feeds to protect against electromagnetic noise.
  4. Environmental Factor Limits: Ensure the installation environment conforms to IP20 or higher cabinet isolation protocols. The site must remain completely clear of moisture condensation, conductive chemical dust, and corrosive vapors to prevent tracking short-circuits.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Remote Terminal Units: The Core of SCADA and Telemetry Systems

Understanding Remote Terminal Units: The Core of SCADA and Telemetry Systems

In industrial automation, engineers often debate the choice between a Programmable Logic Controller (PLC) and...
Read more
Ultimate Guide to Schneider Electric PLCs: Selecting Control Systems for Small to Medium Automation

Ultimate Guide to Schneider Electric PLCs: Selecting Control Systems for Small to Medium Automation

Schneider Electric remains a dominant force in global industrial automation, delivering robust control systems across diverse sectors. For control engineers, selecting the right programmable logic controller (PLC) requires balancing budget, communication ports, and processing power. This technical breakdown explores Schneider’s small and medium portfolio, offering field-tested insights to help you optimize your next factory automation project.

Read more
Essential Maintenance Guide for PLC, DCS, and ESD Marshalling Cabinets

Essential Maintenance Guide for PLC, DCS, and ESD Marshalling Cabinets

Marshalling cabinets serve as the vital interface between field instrumentation and your core control systems. In large-scale industrial automation, these panels house the intricate wiring for PLC, DCS, and Emergency Shutdown (ESD) systems. Regular, systematic health checks are non-negotiable to ensure operational reliability and prevent costly unplanned downtime.

Read more