Skip to content

What are you looking for?


You may also like

ABB YPK112A 3ASD573001A13 Communication ModuleABB YPK112A 3ASD573001A13 Communication ModuleABB YPK112A 3ASD573001A13 Communication Module
ABB YPK112A 3ASD573001A13 Communication Module
ABB YPK112A 3ASD573001A13 Communication Module
ABB YPK112A 3ASD573001A13 Communication Module

ABB YPK112A 3ASD573001A13 Communication Module


Only 10 left - Selling fast

PRODUCT SKU : YPK112A 3ASD573001A13

PRODUCT TYPE : Communication Modules

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The ABB YPK112A 3ASD573001A13, also cataloged as the YPK112A Communication Module, operates as a dedicated hardware component for localized control logic execution within ABB Advant Fieldbus 100 networks. Configured to interface an Application Controller (APC) directly with high-speed serial bus architectures, this unit processes protocol compilation and serial payload transmission to manage data exchange between separate APC sub-nodes or bridging to an overriding Advant Controller AC400-family platform.

Hardware Specifications

Parameter Specification
Model YPK112A 3ASD573001A13
Brand ABB
Origin Switzerland
Weight 0.1 kg
Dimensions 185 mm x 84 mm x 28 mm
Operating Temp 0 to 55 deg C (Standard industrial parameters)
Power Consumption System bus-driven via internal rack connections
Product Type Communication Modules

Profinet / EtherNet/IP Deterministic Networks and I/O Density Scaling

Operating at the physical layer of high-speed serial topologies, the execution rates of the ABB YPK112A 3ASD573001A13 correspond with internal backplane bus communication velocity guidelines. When integrating localized field networks into Profinet or EtherNet/IP deterministic networks via external gateways, the internal data handling arrays prevent network latency deterioration. The internal component layout establishes isolation boundaries that protect critical logic paths during intensive I/O density scaling routines, securing frame transmission stability without altering the native firmware flash compatibility profiles across active system controller channels.

Frequently Asked Questions

Q: Is the YPK112A communication board rated for physical extraction or hot-swap insertion while the APC rack is energized?

A: No. The board does not possess active hot-swap bypass circuitry. Removing or inserting the assembly while the system power rail is live can induce instantaneous voltage tracking errors and permanent chip failures on the module or the host APC interface backplane.

Q: Is an external bus administrator board required for bus control when using this module?

A: Yes, when the communication network does not incorporate an overriding Advant Controller AC450 node, a dedicated CI626 bus administrator board must be integrated into the loop infrastructure to handle network bus token distribution and timing sequences.

Field Installation Guidelines

  1. Electrostatic Discharge (ESD) Protection: Technicians must wear an active, grounded ESD wrist strap before extracting the module from its conductive packaging or initiating any handling steps on the printed circuit frame.
  2. Mechanical Chassis Seating: Power down the controller frame completely before installation. Slide the circuit card straight along the dedicated rack guide slots to prevent pin misalignment, then secure the faceplate fasteners tightly to guarantee proper chassis grounding.
  3. Communication Cable Routing: Separate all serial or fieldbus connection cables from AC power cables and variable frequency drive output leads by a minimum clearance of 100 mm. Utilize grounded low-voltage data raceways to block inductive coupling.
  4. Enclosure Conditioning: Mount the board inside an enclosure that offers appropriate climate mitigation, ensuring that condensation and airborne conductive soot cannot collect on the open circuit traces.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Remote Terminal Units: The Core of SCADA and Telemetry Systems

Understanding Remote Terminal Units: The Core of SCADA and Telemetry Systems

In industrial automation, engineers often debate the choice between a Programmable Logic Controller (PLC) and...
Read more
Ultimate Guide to Schneider Electric PLCs: Selecting Control Systems for Small to Medium Automation

Ultimate Guide to Schneider Electric PLCs: Selecting Control Systems for Small to Medium Automation

Schneider Electric remains a dominant force in global industrial automation, delivering robust control systems across diverse sectors. For control engineers, selecting the right programmable logic controller (PLC) requires balancing budget, communication ports, and processing power. This technical breakdown explores Schneider’s small and medium portfolio, offering field-tested insights to help you optimize your next factory automation project.

Read more
Essential Maintenance Guide for PLC, DCS, and ESD Marshalling Cabinets

Essential Maintenance Guide for PLC, DCS, and ESD Marshalling Cabinets

Marshalling cabinets serve as the vital interface between field instrumentation and your core control systems. In large-scale industrial automation, these panels house the intricate wiring for PLC, DCS, and Emergency Shutdown (ESD) systems. Regular, systematic health checks are non-negotiable to ensure operational reliability and prevent costly unplanned downtime.

Read more