Skip to content

What are you looking for?


You may also like

ABB UNS 2880B-P,V2 3BHE014967R0002 COB PCB AssembledABB UNS 2880B-P,V2 3BHE014967R0002 COB PCB AssembledABB UNS 2880B-P,V2 3BHE014967R0002 COB PCB Assembled
ABB UNS 2880B-P,V2 3BHE014967R0002 COB PCB Assembled
ABB UNS 2880B-P,V2 3BHE014967R0002 COB PCB Assembled
ABB UNS 2880B-P,V2 3BHE014967R0002 COB PCB Assembled

ABB UNS 2880B-P,V2 3BHE014967R0002 COB PCB Assembled


Only 10 left - Selling fast

PRODUCT SKU : 3BHE014967R0002 UNS 2880B-P,V2

PRODUCT TYPE : Control Boards

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-speed signal processing and main unit interface routing in ABB UNITROL power electronics subracks, the ABB UNS 2880B-P,V2 3BHE014967R0002 (UNS 2880B-P,V2 COB PCB Assembled) provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model UNS 2880B-P,V2 (Order Code: 3BHE014967R0002)
Brand ABB
Origin Switzerland
Weight 0.67 kg
Dimensions 290 mm x 47 mm x 450 mm (W x H x D)
Operating Temp 0 to +60 deg C
Power Consumption Powered via system backplane bus supply
Assembly Description COB PCB Assembled
Customs Tariff 85371092
Product Type Control Boards

Firmware Flash Compatibility and High-Density Deterministic Execution

The UNS 2880B-P,V2 circuit board assembly connects directly to the subrack backplane to manage deterministic control loops across multi-node excitation network environments. Internal component architecture maintains firmware flash compatibility with host power converter software modules, preventing execution latencies and data frame drops during high-density I/O scan cycles.

Frequently Asked Questions

Q: Can the UNS 2880B-P,V2 circuit board be replaced while the system subrack is energized?

A: No. Backplane power and auxiliary power sources must be fully de-energized before removing or inserting the printed circuit board to prevent bus communication faults and connector pin edge wear.

Q: How is chassis grounding maintained across the UNS 2880B-P,V2 assembly?

A: Low-impedance chassis grounding is established through factory metallic standoff mounting points and panel retention screws when the module is fully seated into the subrack card cage.

Field Installation Guidelines

  1. Power down the host subrack cabinet and verify that all power supply circuits have fully discharged.
  2. Align the board edges of the UNS 2880B-P,V2 assembly with the card slot guide rails inside the rack.
  3. Slide the board inward until the rear edge connector firmly engages with the mating backplane bus receptacle.
  4. Tighten all panel retention screws to complete mechanical mounting and verify chassis grounding integrity.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more
Industrial Networking Essentials: Demystifying Hubs, Switches, and Routers in Control Systems

Industrial Networking Essentials: Demystifying Hubs, Switches, and Routers in Control Systems

Industrial automation relies heavily on robust networking infrastructure to connect programmable logic controllers (PLCs), distributed control systems (DCS), and human-machine interfaces (HMIs). Modern factory automation environments generate vast amounts of real-time operational data across deterministic networks. Understanding the structural differences between hubs, switches, and routers ensures optimal traffic segmentation, minimizes latency, and maintains high network availability.

Read more