Skip to content

What are you looking for?


You may also like

ABB LDGRB-01 3BSE013177R1 Ground Fault Monitoring ModuleABB LDGRB-01 3BSE013177R1 Ground Fault Monitoring ModuleABB LDGRB-01 3BSE013177R1 Ground Fault Monitoring Module
ABB LDGRB-01 3BSE013177R1 Ground Fault Monitoring Module
ABB LDGRB-01 3BSE013177R1 Ground Fault Monitoring Module
ABB LDGRB-01 3BSE013177R1 Ground Fault Monitoring Module

ABB LDGRB-01 3BSE013177R1 Ground Fault Monitoring Module


Only 10 left - Selling fast

PRODUCT SKU : LDGRB-01 3BSE013177R1

PRODUCT TYPE : Ground Fault Monitoring Modules

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The ABB LDGRB-01 3BSE013177R1, also cataloged as the LDGRB-01 Ground Fault Monitoring Device, operates as a dedicated hardware component for leakage current detection and ground protection within ungrounded AC and DC control networks. The DIN-rail mounted module continuously samples ground fault flow vectors, driving onboard relay contact outputs to trip circuit breakers and isolate electrical hazards upon fault threshold breach.

Hardware Specifications

Parameter Specification
Model LDGRB-01 (3BSE013177R1)
Brand ABB
Rated Voltage 380 VAC
Rated Frequency 50 Hz
Rated Current Range 1.5 A to 350 A
Operating Temp -20 deg C to +40 deg C
Ingress Protection Rating IP55
Mounting Orientation Multiple positions (M1 through M6)
Efficiency Up to 97%
Acoustic Noise Level Less than 80 dB
Power Consumption System powered via internal control bus circuits
Dimensions Standard DIN-rail module form factor
Weight Standard control module rating
Field Interfaces Digital inputs, relay outputs, Modbus/Profibus bus port
Origin Sweden

Deterministic Networks & Fieldbus Communication Integration

The ABB LDGRB-01 architecture incorporates dedicated bus controller hardware to sustain stable data transmission across Profinet and fieldbus networks. The onboard processing unit evaluates incoming digital triggers and fault currents without introducing latency to downstream industrial controllers. Firmware flash compatibility maintains parameter configuration memory during power outages, ensuring consistent relay output tripping curves and load grouping thresholds across integrated DCS and PLC control loops.

Frequently Asked Questions

Q: How does the LDGRB-01 handle external trip trigger conditions from secondary protection units?

A: The module utilizes galvanically isolated digital input channels configured to register external dry-contact closure or logic state changes, executing immediate relay trip output sequences.

Q: Can the ground fault monitoring parameters be modified over the serial interface during operation?

A: Yes. Parameter values can be updated over the onboard Modbus/Profibus fieldbus port, provided the controller possesses valid flash write authorization levels and the main control loop remains in a safe monitoring state.

Q: What mounting configurations are permitted to maintain the IP55 ingress rating?

A: The module supports mechanical installation across defined mounting positions M1 through M6 on standard DIN rails inside sealed enclosure assemblies.

Field Installation Guidelines

Observe the following procedures when installing and wiring the ground fault monitoring module:

  1. Power De-energization: Lock out and tag out all 380 VAC power lines feeding the target control enclosure. Verify the absence of potential using a calibrated multimeter prior to handling conductor terminals.
  2. DIN-Rail Mounting: Snap the module onto an omega-profile 35 mm DIN rail in any approved mounting orientation (M1 to M6). Ensure the rear metal locking clip fully engages the rail.
  3. Grounding & Shielding: Connect the module ground terminal directly to the main copper earth busbar using a short, low-impedance conductor. Route communication cables in shielded twisted-pair wiring away from high-current AC motor leads.
  4. Signal Terminal Wiring: Secure load grouping digital inputs and trip relay output wires into the screw terminal blocks, torquing terminal screws to 0.5 N-m to prevent high-vibration loose contacts.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Demystifying CPU Communication Ports in Siemens PLC Architectures

Demystifying CPU Communication Ports in Siemens PLC Architectures

Industrial automation relies heavily on robust data exchange between devices. Without seamless connectivity, field instruments, network switches, human-machine interfaces, and programmable logic controllers cannot coordinate effectively. Therefore, understanding the various CPU communication ports available in Siemens hardware ensures efficient factory automation design and seamless system integration.

Read more
Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Industrial automation relies heavily on programmable logic controllers (PLCs) to manage complex manufacturing processes. Many engineers dive straight into programming without mastering the underlying architecture. However, understanding how a PLC CPU executes a program ensures reliable system design. Therefore, mastering the scan cycle optimizes both performance and troubleshooting in modern control systems.

Read more
How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

Establishing a reliable hardware link between a programming terminal and a Siemens SIMATIC controller is essential for engineering workflows. Field engineers rely on distinct physical layers, ranging from legacy serial connections to high-speed Industrial Ethernet protocols. Modern factory automation environments prioritize fast data transfer and seamless driver integration. Selecting the correct connection method simplifies program downloads, online monitoring, and system troubleshooting in complex control systems.

Read more