Skip to content

What are you looking for?


You may also like

ABB DSTK 153 Ribbon Cable | 26390603-GABB DSTK 153 Ribbon Cable | 26390603-GABB DSTK 153 Ribbon Cable | 26390603-G
ABB DSTK 153 Ribbon Cable | 26390603-G
ABB DSTK 153 Ribbon Cable | 26390603-G
ABB DSTK 153 Ribbon Cable | 26390603-G

ABB DSTK 153 Ribbon Cable | 26390603-G


Only 10 left - Selling fast

PRODUCT SKU : DSTK 153 26390603-G

PRODUCT TYPE : Pre-Fabricated Cables

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The ABB DSTK 153 26390603-G, also cataloged as the DSTK 153 Pre-Fabricated Cables, operates as a dedicated hardware component for internal signal transmission and rack interconnection within ABB Advant Master process control systems.

Hardware Specifications

Parameter Specification
Model DSTK 153
Order Code 26390603-G
Brand ABB
Origin Poland / United States
Product Type Pre-Fabricated Cables
Cable Assembly Length 3.0 m
Cable Type Flat Ribbon Cable
Weight 0.66 kg
Dimensions Standard ribbon cable footprint (3.0 m assembly)
Operating Temp 0 to 55 deg C
Power Consumption Passive conductor assembly
Customs Tariff Number 85446090
RoHS Compliance Exempt from 2011/65/EU under Article 2(4)

Backplane Bus Communication & Firmware Flash Compatibility

The ABB DSTK 153 3.0-meter flat ribbon cable maintains backplane bus signal continuity across adjacent subrack assemblies and system termination units. Parallel multi-conductor tracks minimize cross-talk and propagation delay, enabling high-rate signal transfers between I/O modules and controller communication interfaces. Correct pinout mapping maintains firmware flash compatibility and system address integrity across connected racks without altering system timing parameters.

Frequently Asked Questions

Q: What physical length does the DSTK 153 pre-fabricated ribbon cable provide?

A: The DSTK 153 cable assembly is provided at a fixed pre-fabricated length of 3.0 meters.

Q: Can the DSTK 153 ribbon cable be connected or disconnected while system power is active?

A: Subrack power and field terminal supplies must be de-energized prior to plugging or unplugging the ribbon cable connectors to avoid bus voltage disruption and potential signal interference.

Field Installation Guidelines

  1. Power down the target subrack and associated expansion chassis prior to handling cable connections.
  2. Align the keyway of the ribbon cable connector with the mating header on the backplane or terminal unit.
  3. Press the connector housing straight into the receptacle until the locking ears snap securely into place.
  4. Route the 3.0-meter flat cable assembly inside dedicated wire ducts, ensuring the minimum bend radius is preserved without twisting or pinching.
  5. Separate ribbon signal paths from high-voltage AC conductors and drive wiring to minimize electromagnetic noise coupling.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Mastering the Factory Acceptance Test (FAT) for PLC Control Panels: An Expert Guide

Mastering the Factory Acceptance Test (FAT) for PLC Control Panels: An Expert Guide

The Factory Acceptance Test (FAT) is a vital milestone in industrial automation that ensures custom PLC panels meet exact design specifications before dispatch. This guide outlines the step-by-step FAT procedure and key industry best practices to prevent costly site delays and ensure long-term operational success.

Read more
Redundant Automation Systems: Ensuring Continuous Uptime in Critical Control Infrastructure

Redundant Automation Systems: Ensuring Continuous Uptime in Critical Control Infrastructure

System reliability directly determines operational profitability across high stakes process industries. Modern industrial automation platforms must eliminate single points of failure to prevent catastrophic shutdowns. Deploying fault tolerant architecture safeguards complex facilities against unexpected hardware glitches, network disruptions, and maintenance outages.

Read more
Understanding Types of Noise in Electronic Circuits and Control Systems

Understanding Types of Noise in Electronic Circuits and Control Systems

Signal integrity directly determines measurement accuracy and loop stability across industrial automation environments. Electronic noise introduces unwanted stochastic interference into analog loops, sensor feedback lines, and digital fieldbus networks. Understanding how intrinsic electronic noise and external electromagnetic interference manifest allows control engineers to optimize signal conditioning and shield sensitive instrumentation effectively.

Read more