Skip to content

What are you looking for?


You may also like

PR6423/010-030 & CON021 | Emerson | Eddy Current SensorsPR6423/010-030 & CON021 | Emerson | Eddy Current SensorsPR6423/010-030 & CON021 | Emerson | Eddy Current Sensors
PR6423/010-030 & CON021 | Emerson | Eddy Current Sensors
PR6423/010-030 & CON021 | Emerson | Eddy Current Sensors
PR6423/010-030 & CON021 | Emerson | Eddy Current Sensors

PR6423/010-030 & CON021 | Emerson | Eddy Current Sensors


Only 10 left - Selling fast

PRODUCT SKU : CON021+PR6423/010-030

PRODUCT TYPE : Proximity Sensors

PRODUCT VENDOR : EMERSON


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for non-contact displacement monitoring in rotating machinery, the Emerson PR6423/010-030 (PR6423/010-030) transducer paired with the CON021 signal converter provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model PR6423/010-030 + CON021
Brand Emerson
Origin United States
Weight 0.3 kg
Dimensions 4.1 cm x 15.9 cm x 10.8 cm
Operating Temp Industrial grade
Power Consumption Nominal excitation required

Gap Voltage Validation (-10 VDC targets)

The system utilizes an oscillator circuit to drive the transducer probe, creating an electromagnetic field for displacement detection. To ensure accurate linearization, the system necessitates precise gap voltage validation during commissioning. The converter centers its output characteristic around a nominal target of -10 VDC, representing the mid-point of the physical measurement gap. Maintenance of this -10 VDC baseline is mandatory for accurate signal tracking; significant deviations indicate mechanical misalignment, transducer saturation, or degradation of the conductive target surface.

Frequently Asked Questions

Q: Does the CON021 converter support hot-swap replacement?

A: The converter is designed for rack-based mounting systems. Hot-swap capability depends on the backplane architecture of the monitoring rack. Ensure the specific rack chassis supports energized module removal before attempting replacement.

Q: Is shielding required for the probe cable?

A: Yes. To mitigate electromagnetic interference, the probe cable must be routed through grounded metallic conduit, and the shield must be terminated exclusively at the monitoring system rack to prevent ground-loop current injection.

Field Installation Guidelines

  1. Mount the transducer in a rigid, vibration-isolated bracket to minimize extraneous mechanical noise and prevent housing fatigue.
  2. Ensure the measurement target surface is clean and free of non-conductive coatings to maintain the required electrical conductivity.
  3. Establish the nominal air gap using a non-metallic feeler gauge to prevent contact damage to the sensor tip during startup.
  4. Route signal cabling through grounded metallic conduit, keeping lines physically separated from high-current AC power lines.
  5. Terminate the signal shield at the monitoring system (DCS/TSI) rack only.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Dry Contacts in PLC Wiring: An Industrial Automation Guide

Understanding Dry Contacts in PLC Wiring: An Industrial Automation Guide

Mastering contact switching principles is essential for reliable control panels. Field devices and PLCs interface through dry or wet contacts. This technical guide examines the mechanics of dry contacts, explores their wiring architectures, and evaluates their key advantages in industrial automation.

Read more
Ultimate Commissioning Checklist for Industrial Automation Systems: An Engineering Guide

Ultimate Commissioning Checklist for Industrial Automation Systems: An Engineering Guide

Commissioning is the most decisive phase of an industrial automation project, transforming control hardware and software into an operational facility. Thorough testing prevents costly startup delays and builds customer confidence. This guide covers essential checklists, electrical standards, and best practices.

Read more
Redundant Automation Systems: Core Architecture, Business Value, and Technical Advantages

Redundant Automation Systems: Core Architecture, Business Value, and Technical Advantages

Unplanned downtime poses a major financial threat to process manufacturing. To prevent costly interruptions, engineers deploy redundant PLC and DCS architectures that ensure continuous operation when hardware fails. This technical guide explores redundancy principles, critical system nodes, and real-world scenarios.

Read more