PRODUCT SKU : 51304338-100

PRODUCT TYPE : Redundancy Modules

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The Honeywell 51304338-100, also cataloged as the 51304338-100 Redundancy Switching Module, operates as a dedicated hardware component for dual-node state arbitration and failover switching execution within Honeywell process controller racks. Configured as an exchangeable A/O redundant Field Termination Assembly (FTA), the board routes differential logic signals between primary and backup controller processors. Internal circuitry controls physical bus switching transitions, preventing signal disruption across active backplane channels during automated module switchover events.

Hardware Specifications

Parameter Specification
Model 51304338-100
Brand Honeywell
Origin USA
Weight 0.75 lbs (0.34 kg)
Dimensions Standard FTA Board Footprint
Operating Temp 0 to 60 deg C
Power Consumption 3.5 W
Module Type Redundancy Switching Module / FTA
System Configuration Exchangeable A/O Redundant Architecture
Mounting Type DIN-rail or FTA Mounting Channel

Channel-to-Channel Isolation

The 51304338-100 incorporates channel-to-channel isolation barriers across its redundant switching paths to prevent cross-talk and electrical short circuits between Primary (A) and Backup (O) controller buses. Galvanic separation shields the switching control logic against line voltage spikes and field ground potential differences. This isolated architecture maintains continuous data frame transfer across active channels during automated failover sequences.

Frequently Asked Questions

Q: Can the 51304338-100 module be replaced while the host controller rack remains energized?

A: Yes, provided the redundant backup controller is active and holding primary control prior to extracting the secondary FTA module.

Q: How does the 51304338-100 execute switching during a primary controller fault?

A: Internal hardware logic detects loss of heartbeat or bus activity from the active channel and triggers physical relay state changes to route control lines to the standby node within millisecond thresholds.

Q: What mounting hardware is required to install the 51304338-100 switching board?

A: The assembly snaps directly into standard Honeywell FTA mounting channels, utilizing integrated grounding clips to establish chassis earth connection.

Field Installation Guidelines

  1. Verify that power to the specific I/O termination channel is isolated before attaching field wiring to the FTA terminals.
  2. Align the 51304338-100 circuit board with the FTA mounting channel track and push firmly until the retention latches engage.
  3. Secure redundant communication bus cables to the designated port headers, ensuring retention screws are hand-tightened.
  4. Keep low-voltage signal wiring separated from high-voltage AC conductors inside cabinet wireways to minimize noise coupling.
  5. Connect the FTA ground strap directly to the main enclosure earth bonding bar using a short, low-impedance copper lead.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
DCS Commissioning Steps in Industrial Automation Projects

DCS Commissioning Steps in Industrial Automation Projects

Commissioning a Distributed Control System (DCS) represents a crucial milestone when deploying modern process automation infrastructure. Field engineers must execute systematic verification steps to transition complex control hardware from static installation to dynamic plant control. Proper commissioning ensures that controllers, I/O modules, network switches, and HMI software operate in strict compliance with engineering design specifications before introducing live process fluids.

Read more
PLC and DCS Control System Spares Strategy: Engineering Guidelines

PLC and DCS Control System Spares Strategy: Engineering Guidelines

Modern factory automation relies on high-speed fiber optic backbones to link distributed control systems across noise-intensive industrial environments. Unlike copper wiring, optical fibers transmit data via light pulses, making them completely immune to electromagnetic interference (EMI). Field engineers must master optical cable joining and fusion splicing techniques to guarantee low-loss data transmission across critical Programmable Logic Controller (PLC) and Distributed Control System (DCS) nodes.

Read more
PLC and DCS Control System Spares Strategy: Engineering Guidelines

PLC and DCS Control System Spares Strategy: Engineering Guidelines

Industrial automation lifecycle management requires robust spare parts planning for Programmable Logic Controller (PLC) and Distributed Control System (DCS) platforms. Plant engineers must correctly categorize spare components during front-end engineering design to maintain high system availability. Miscalculating spare requirements can lead to prolonged unscheduled downtime, project budget overruns, or delayed site commissioning.

Read more