Skip to content

What are you looking for?


You may also like

Emerson PR6423/000-101 EPRO Eddy Current SensorsEmerson PR6423/000-101 EPRO Eddy Current SensorsEmerson PR6423/000-101 EPRO Eddy Current Sensors
Emerson PR6423/000-101 EPRO Eddy Current Sensors
Emerson PR6423/000-101 EPRO Eddy Current Sensors
Emerson PR6423/000-101 EPRO Eddy Current Sensors

Emerson PR6423/000-101 EPRO Eddy Current Sensors


Only 10 left - Selling fast

PRODUCT SKU : PR6423/000-101

PRODUCT TYPE : Eddy Current Sensors

PRODUCT VENDOR : EMERSON


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for non-contact dynamic shaft displacement measurement in machinery monitoring networks, the Emerson PR6423/000-101 (PR6423/000-101 Eddy Current Sensors) provides direct physical signal conditioning and electromagnetic gap execution. The unit converts target movement into proportional voltage output across rotating machinery instrumentation loops.

Hardware Specifications

Parameter Specification
Model PR6423/000-101
Brand Emerson
Origin Germany
Dimensions 25 mm case thread length
Operating Temp 0 to 45 deg C
Power Consumption Powered via external signal converter
Linear Measurement Range 2 mm (80 mils)
Initial Air Gap 0.5 mm (20 mils)
Incremental Scale Factor 8 V/mm (203.2 mV/mil) +/- 5% at 0 to 45 deg C
DSL Accuracy +/- 0.025 mm (+/- 1 mil) deviation from best fit straight line
Cable Length 4.0 m
Cable Termination Open cable end
Adapter Plug Without adapter plug
Product Type Eddy Current Sensors

4-20 mA HART Loop Protocol and Channel Isolation

The signal evaluation path downstream from the sensor utilizes channel-to-channel isolation topology to isolate raw transducer potential from common-mode ground noise. When interfacing with plant monitoring networks operating 4-20 mA HART loop protocol transmitters or FOUNDATION Fieldbus nodes, the sensor maintains defined analog signal boundaries. Integrated thermal tracking preserves scale factor stability, minimizing offset drift to maintain accurate cold junction compensation and measurement integrity over the operational temperature range.

Frequently Asked Questions

Q: How does the open cable end termination of the PR6423/000-101 connect to downstream evaluation electronics?

A: The flying leads connect directly to screw terminals or crimp connectors inside a field junction box or signal converter housing, requiring proper shield termination to prevent signal noise.

Q: What is the effect of shortening the 4.0 m integrated cable during field installation?

A: Trimming or splicing the 4.0 m integral cable changes the LC oscillator circuit characteristics, altering the calibrated 8 V/mm scale factor and invalidating factory calibration.

Q: How is the physical gap zeroed during mechanical installation?

A: Position the probe head using precision feeler gauges or monitor the DC bias voltage at the signal converter to establish the target 0.5 mm initial air gap baseline.

Field Installation Guidelines

  1. Inspect the target rotor shaft area to verify the surface is free of mechanical scratches, rust, and magnetic runout.
  2. Thread the 25 mm probe sleeve into the rigid mounting bracket perpendicular to the shaft centerline.
  3. Adjust insertion depth until reaching the 0.5 mm initial air gap setting using non-magnetic shims or static DC gap voltage verification.
  4. Torque the outer locknut to fixed installation specifications to prevent thermal or vibration loosening.
  5. Extend the 4.0 m open-ended cable to the local terminal housing without bending past the minimum bend radius.
  6. Land the open wire conductors onto the signal converter terminals, securing the cable outer shield to the cabinet single-point ground.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Demystifying the DDE Protocol in Legacy Industrial Automation Systems

Demystifying the DDE Protocol in Legacy Industrial Automation Systems

Modern control systems rely heavily on seamless interprocess communication to exchange operational data between software programs. Microsoft first introduced the Dynamic Data Exchange (DDE) protocol in 1987 to enable real-time data sharing. In factory automation, DDE served as an early bridge between control software and Windows desktop applications. Therefore, understanding DDE mechanics provides crucial insights into how legacy industrial networks established software-level connectivity.

Read more
Demystifying CPU Communication Ports in Siemens PLC Architectures

Demystifying CPU Communication Ports in Siemens PLC Architectures

Industrial automation relies heavily on robust data exchange between devices. Without seamless connectivity, field instruments, network switches, human-machine interfaces, and programmable logic controllers cannot coordinate effectively. Therefore, understanding the various CPU communication ports available in Siemens hardware ensures efficient factory automation design and seamless system integration.

Read more
Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Industrial automation relies heavily on programmable logic controllers (PLCs) to manage complex manufacturing processes. Many engineers dive straight into programming without mastering the underlying architecture. However, understanding how a PLC CPU executes a program ensures reliable system design. Therefore, mastering the scan cycle optimizes both performance and troubleshooting in modern control systems.

Read more