Skip to content

What are you looking for?


You may also like

GE FANUC D25-0158-000002 Control and Monitoring DeviceGE FANUC D25-0158-000002 Control and Monitoring DeviceGE FANUC D25-0158-000002 Control and Monitoring Device
GE FANUC D25-0158-000002 Control and Monitoring Device
GE FANUC D25-0158-000002 Control and Monitoring Device
GE FANUC D25-0158-000002 Control and Monitoring Device

GE FANUC D25-0158-000002 Control and Monitoring Device


Only 10 left - Selling fast

PRODUCT SKU : D25-0158-000002

PRODUCT TYPE : Control and Monitoring Devices

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The GE FANUC D25-0158-000002, also cataloged as the D25 Control and Monitoring Device, operates as a dedicated hardware component for specific technical task execution within industrial automation and network platforms. The module executes data ingestion across modular input spans including up to 15 AC analog nodes, 16 DC analog channels, and 96 digital status points. It acts on real-time parameters via a maximum of 32 trip/close control output pairs while transmitting co-processed telemetry packets through dual host ports, internal IED links, and a dedicated IRIG time-synchronization terminal.

Hardware Specifications

Parameter Specification
Model D25-0158-000002
Brand GE FANUC
Origin Technical specifications determine factory origin
Weight Chassis internal assembly configuration dependent
Dimensions 19-inch rack mount frame compatibility / Height: 8.75 inches (22.22 cm)
Operating Temp Industrial grade environmental tolerance
Power Consumption Base processor draw plus expansion slot load metrics
AC Analog Inputs Configurable options: 0, 3, 6, 9, 12, or 15 inputs
DC Analog Inputs Configurable options: 0, 8, or 16 inputs
Digital Status Inputs 0 to 96 inputs (scaled in increments of 32)
Control Outputs 0, 8, 16, or 32 trip/close pairs
Host Communication Ports 2 serial (38.4 Kbps) or 2 Ethernet (10 Mbps)
IED Communication Ports 2 channels (38.4 Kbps)
Time Synchronization 1 IRIG / Rugby / GPS synchronization port
Local Interface Ports 1 WESMAINT Configuration Port (9600 bps), 1 D25 Display Port (9600 bps)

Firmware Flash Compatibility and I/O Density Scaling

The internal controller bus synchronizes the data paths of all integrated sub-modules, demanding rigid firmware flash compatibility across active memory registers during expansion. When escalating digital input boards up to the 96-channel ceiling, the scaling engine limits execution jitter by parsing incoming status changes in designated hardware registers. This isolates background telecontrol polling via the 10 Mbps Ethernet ports from the direct execution loops of the 32 trip/close output relays, preserving deterministic processing speeds during substation fault conditions.

Frequently Asked Questions

Q: How does the system validate internal card additions when scaling the digital inputs to 96 channels?

A: The central processor checks the physical sub-board array during the power-on boot sequence. Installed expansions must match the parameters defined within the system firmware flash image; unmapped or mismatched hardware IDs halt the internal bus and flag a configuration error through the WESMAINT port.

Q: Can the serial host ports or the digital output cards be hot-swapped while control power is active?

A: No. The internal backplane traces and board interconnections lack insulation for live servicing. Auxiliary supply voltage must be fully isolated from the 19-inch rack before inserting or extracting any cards to prevent logic component failure or unintended trip execution.

Field Installation Guidelines

  • Enclosure Grounding: Secure a low-impedance copper earthing strap from the ground stud located on the rear of the rack enclosure directly to the primary station panel ground bus bar.
  • Shielding Protocol: Wire all DC analog inputs and time synchronization lines using shielded twisted-pair cables, bonding the outer shield braid exclusively at the entry terminal enclosure plate to prevent ground loop currents.
  • Conduit Isolation: Route high-current control output pairs through independent metal wireways completely separated from low-voltage serial connections, Ethernet cables, and sensitive IRIG timing lines.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Mastering Modern Industrial Joystick Controls in Heavy Automation

Mastering Modern Industrial Joystick Controls in Heavy Automation

Industrial joysticks play a pivotal role in human-machine interaction across heavy material handling and mobile hydraulics. These tactile controllers translate complex operator movements into precise electrical signals for PLCs, motion controllers, and DCS networks. Consequently, selecting and installing the right joystick architecture ensures operator safety, reduces fatigue, and optimizes equipment performance.

Read more
Navigating Industrial Automation Failures: Types, Causes, and Mitigation Strategies

Navigating Industrial Automation Failures: Types, Causes, and Mitigation Strategies

Modern manufacturing relies heavily on automated control systems to maximize throughput and maintain product quality. However, unplanned downtime in industrial automation can cost facility operators thousands of dollars per hour. Understanding how programmable logic controllers (PLCs), distributed control systems (DCS), and field instrumentation fail empowers engineering teams to implement robust preventive maintenance strategies.

Read more
Essential Motion Control Commands: A Practical Guide for Engineers

Essential Motion Control Commands: A Practical Guide for Engineers

Automation engineers often rely on precise position and speed control to drive modern factory machinery. Modern industrial systems, such as Programmable Logic Controllers (PLCs) and Distributed Control Systems (DCS), depend heavily on standardized motion instructions. Mastering these commands ensures operational safety, protects mechanical components, and optimizes cycle times across production lines.

Read more