Skip to content

What are you looking for?


You may also like

GE IS210BPPBH2BJD Mark VI Speedtronic Processor BoardGE IS210BPPBH2BJD Mark VI Speedtronic Processor BoardGE IS210BPPBH2BJD Mark VI Speedtronic Processor Board
GE IS210BPPBH2BJD Mark VI Speedtronic Processor Board
GE IS210BPPBH2BJD Mark VI Speedtronic Processor Board
GE IS210BPPBH2BJD Mark VI Speedtronic Processor Board

GE IS210BPPBH2BJD Mark VI Speedtronic Processor Board


Only 10 left - Selling fast

PRODUCT SKU : IS210BPPBH2BJD

PRODUCT TYPE : Processor Modules

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The GE IS210BPPBH2BJD, also cataloged as the IS210BPPBH2B Processor Board, operates as a dedicated hardware component for auxiliary signal execution within Mark VI Speedtronic platforms.

Hardware Specifications

Parameter Specification
Model IS210BPPBH2BJD
Brand General Electric
Origin USA
Weight 0.35 kg
Dimensions 150 x 100 x 25 mm
Operating Temp 0 to 60 deg C
Power Consumption 5 W
Functional Acronym BPPB
Board Coating Conformal Coating
Functional Revision Grade B
Physical Layout Daughterboard mounting via 4 corner standoff screws
Onboard Hardware Transistors, Inductor, Transformer, Crystal Oscillator, ICs
Interconnect Types 2 x Female Jack Connectors, 1 x Multi-position Plug, 1 x 3-position Plug
Status Visuals 2 x Edge-Mounted LED Indicators

Backplane Bus Communication Velocity and Firmware Flash Compatibility

The IS210BPPBH2BJD mounts directly to the WETA parent board, maintaining high-speed signal routing across the internal connector interface. The onboard crystal oscillator provides clock generation to stabilize backplane bus communication velocity across localized control loops. Firmware flash compatibility ensures seamless interaction with host Mark VI processor logic during instruction cycles. Integrated circuit logic processes input signals directly, while onboard test points allow direct signal tracing and voltage measurement across internal board traces.

Frequently Asked Questions

Q: How does the IS210BPPBH2BJD attach to the primary system board?

A: The board functions as a daughterboard and mounts directly to the parent PCB using four screws threaded into corner standoffs through factory-drilled mounting holes.

Q: What onboard components provide visual status feedback during operations?

A: Two LED components positioned side-by-side along one edge of the PCB deliver real-time visual status indications.

Q: Can onboard electrical values be measured while the board is installed?

A: Integrated TP test points located on the surface allow technicians to verify voltage rails and trace signal waveforms with multimeter or oscilloscope probes.

Field Installation Guidelines

Ensure all power sources to the host rack module are completely de-energized before beginning installation or maintenance. Wear a grounded ESD wrist strap connected to the enclosure frame to prevent static damage to sensitive integrated circuits and transistors. Position the module over the parent board standoffs, align the multi-position male and female plugs, and press firmly until seated. Torque the four corner mounting screws hand-tight to ensure mechanical stability without warping the substrate. Route all interconnecting field and bus cables away from sharp PCB edges and high-voltage conductors.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Industrial automation relies heavily on programmable logic controllers (PLCs) to manage complex manufacturing processes. Many engineers dive straight into programming without mastering the underlying architecture. However, understanding how a PLC CPU executes a program ensures reliable system design. Therefore, mastering the scan cycle optimizes both performance and troubleshooting in modern control systems.

Read more
How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

Establishing a reliable hardware link between a programming terminal and a Siemens SIMATIC controller is essential for engineering workflows. Field engineers rely on distinct physical layers, ranging from legacy serial connections to high-speed Industrial Ethernet protocols. Modern factory automation environments prioritize fast data transfer and seamless driver integration. Selecting the correct connection method simplifies program downloads, online monitoring, and system troubleshooting in complex control systems.

Read more
Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Modern manufacturing is undergoing a rapid technological transformation driven by Industry 4.0 innovations. Technologies like Artificial Intelligence (AI), Machine Learning (ML), and the Industrial Internet of Things (IIoT) are dominating discussions across the factory automation sector. Consequently, many engineers wonder if these advanced digital tools will eventually replace traditional Programmable Logic Controllers (PLCs). However, evaluating the core physics of industrial operations reveals a very different reality for control systems.

Read more