Skip to content

What are you looking for?


You may also like

GE DS200SDCCG1A Drive Control CardGE DS200SDCCG1A Drive Control CardGE DS200SDCCG1A Drive Control Card
GE DS200SDCCG1A Drive Control Card
GE DS200SDCCG1A Drive Control Card
GE DS200SDCCG1A Drive Control Card

GE DS200SDCCG1A Drive Control Card


Only 10 left - Selling fast

PRODUCT SKU : DS200SDCCG1A

PRODUCT TYPE : Drive Control Cards

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-speed motor and excitation regulation in Mark V control systems, the GE DS200SDCCG1A (DS200SDCC Drive Control Card) provides direct physical execution of drive control, motor management, and I/O signal processing.

Hardware Specifications

Parameter Specification
Model DS200SDCCG1A
Brand General Electric
Origin USA
Dimensions 6.25 in x 4.25 in
Operating Temp -30 deg C to 65 deg C
Power Consumption Not specified
Architecture 3 x 16-bit microprocessors with dual-ported RAM

Backplane Bus Communication and Deterministic Processing

The DS200SDCCG1A utilizes three 16-bit microprocessors interconnected via dual-ported RAM (DPR) to manage drive excitation and motor control loops. This architecture ensures deterministic backplane bus communication velocity when interfacing with auxiliary boards for complex ac/dc motor drive configurations. The card employs general-purpose interface circuitry to handle exciter and customer I/O signals, with secondary dual-ported RAM modules available to expand processing capacity. In TC2000 applications, the primary microprocessors handle high-priority control tasks, maintaining synchronization across the Mark V backplane. Firmware flash compatibility and site-specific tuning parameters are maintained via onboard memory interfaces to ensure precise regulation of motor field and armature current.

Frequently Asked Questions

Q: Does the DS200SDCCG1A support hot-swapping within the Mark V rack?

A: No. The card must be inserted or removed only after the system has been fully de-energized. Hot-swapping risks electrical damage to the dual-ported RAM and processor circuitry due to bus contention during insertion.

Q: How is signal synchronization maintained between the primary microprocessors?

A: Synchronization is managed through the integrated dual-ported RAM (DPR) arrays, which allow the three microprocessors to access shared memory data concurrently without conflicting bus access.

Field Installation Guidelines

  1. Ensure the Mark V system is in a powered-down state before installing the card to prevent potential corruption of the onboard dual-ported RAM.
  2. Verify all backplane connector alignments before engaging the module to prevent bent pins or improper bus contact.
  3. Handle the module by the edges and faceplate to prevent electrostatic discharge damage to the high-density microprocessors.
  4. After seating the board, verify that the system registers correctly detect the presence of the card and that I/O signal loops are correctly terminated on the associated terminal boards.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Industrial automation relies heavily on programmable logic controllers (PLCs) to manage complex manufacturing processes. Many engineers dive straight into programming without mastering the underlying architecture. However, understanding how a PLC CPU executes a program ensures reliable system design. Therefore, mastering the scan cycle optimizes both performance and troubleshooting in modern control systems.

Read more
How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

Establishing a reliable hardware link between a programming terminal and a Siemens SIMATIC controller is essential for engineering workflows. Field engineers rely on distinct physical layers, ranging from legacy serial connections to high-speed Industrial Ethernet protocols. Modern factory automation environments prioritize fast data transfer and seamless driver integration. Selecting the correct connection method simplifies program downloads, online monitoring, and system troubleshooting in complex control systems.

Read more
Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Modern manufacturing is undergoing a rapid technological transformation driven by Industry 4.0 innovations. Technologies like Artificial Intelligence (AI), Machine Learning (ML), and the Industrial Internet of Things (IIoT) are dominating discussions across the factory automation sector. Consequently, many engineers wonder if these advanced digital tools will eventually replace traditional Programmable Logic Controllers (PLCs). However, evaluating the core physics of industrial operations reveals a very different reality for control systems.

Read more