Skip to content

What are you looking for?


You may also like

DS200CPCAG1A GE Contactor Pilot BoardDS200CPCAG1A GE Contactor Pilot BoardDS200CPCAG1A GE Contactor Pilot Board
DS200CPCAG1A GE Contactor Pilot Board
DS200CPCAG1A GE Contactor Pilot Board
DS200CPCAG1A GE Contactor Pilot Board

DS200CPCAG1A GE Contactor Pilot Board


Only 10 left - Selling fast

PRODUCT SKU : DS200CPCAG1A

PRODUCT TYPE : Contactor Pilot Boards

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for contactor control and excitation management in EX2000 systems, the GE DS200CPCAG1A (DS200CPCA Contactor Pilot Board) provides direct physical/electrical execution of coil switching sequences.

Hardware Specifications

Parameter Specification
Model DS200CPCAG1A
Brand GE (General Electric)
Origin USA
Weight 0.45 kg
Dimensions 23.8 cm x 8.6 cm
Operating Temp -35 to 65 deg C
Power Consumption 25 VDC (Control Logic)
Input Voltage 115 VAC
Output Voltage 105 VDC (Contactor Coil Drive)

PLC/DCS Deterministic Network Integration

The DS200CPCAG1A manages contactor state transitions by rectifying 115 VAC input into 105 VDC output for coil actuation. Integration into the EX2000 system requires precise coordination with the existing backplane bus communication velocity. As a critical link in the excitation sequence, this board maintains deterministic timing during state changes, ensuring that coil voltage is sustained to keep the contactor closed. Firmware flash compatibility and hardware handshaking protocols must be verified against the host controller revision to prevent timing latencies during high-frequency switching operations.

Frequently Asked Questions

Q: Can the test points CPH and CPN be measured with standard grounded multimeters?

A: No. CPH and CPN are not referenced to the drive's common level. All measurements must be performed using isolated test equipment capable of measuring floating potentials to prevent circuit damage or ground fault conditions.

Q: How does the CPCA functionality differ from the CDBA board in terms of load handling?

A: While the CDBA board initiates the electricity for contactor operation, the CPCA board provides the full voltage required to close and maintain the contactor in a closed state, assuming the primary load responsibilities for the coil drive.

Field Installation Guidelines

  • Mounting: Ensure the board is securely seated in the designated EX2000 cabinet slot using the provided guide rails. Verify mechanical clearance for the 23.8 cm x 8.6 cm footprint.
  • Wiring: Use appropriate gauge wire for the 115 VAC input connections. Ensure all terminals are tightened to specified torque values to prevent high-resistance connections and overheating during continuous coil activation.
  • Grounding and Shielding: Ensure the cabinet chassis is properly earth-grounded. Because the board handles AC-to-DC conversion for inductive loads, maintain physical separation between signal cables and high-power conductors to mitigate electromagnetic interference.
  • Testing: Before applying full system power, perform continuity checks using isolated equipment at the designated test points (CPH, CPN, PSP, PSN) to verify correct voltage polarity and conversion levels.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Industrial automation relies heavily on programmable logic controllers (PLCs) to manage complex manufacturing processes. Many engineers dive straight into programming without mastering the underlying architecture. However, understanding how a PLC CPU executes a program ensures reliable system design. Therefore, mastering the scan cycle optimizes both performance and troubleshooting in modern control systems.

Read more
How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

Establishing a reliable hardware link between a programming terminal and a Siemens SIMATIC controller is essential for engineering workflows. Field engineers rely on distinct physical layers, ranging from legacy serial connections to high-speed Industrial Ethernet protocols. Modern factory automation environments prioritize fast data transfer and seamless driver integration. Selecting the correct connection method simplifies program downloads, online monitoring, and system troubleshooting in complex control systems.

Read more
Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Modern manufacturing is undergoing a rapid technological transformation driven by Industry 4.0 innovations. Technologies like Artificial Intelligence (AI), Machine Learning (ML), and the Industrial Internet of Things (IIoT) are dominating discussions across the factory automation sector. Consequently, many engineers wonder if these advanced digital tools will eventually replace traditional Programmable Logic Controllers (PLCs). However, evaluating the core physics of industrial operations reveals a very different reality for control systems.

Read more