Skip to content

What are you looking for?


You may also like

Bachmann MP213/E PLC ModuleBachmann MP213/E PLC ModuleBachmann MP213/E PLC Module
Bachmann MP213/E PLC Module
Bachmann MP213/E PLC Module
Bachmann MP213/E PLC Module

Bachmann MP213/E PLC Module


Only 10 left - Selling fast

PRODUCT SKU : MP213/E

PRODUCT TYPE : CPU Processors

PRODUCT VENDOR : Bachmann


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-speed logic execution in M1 automation platforms, the Bachmann MP213/E (MP213/E PLC Module) provides direct physical/electrical execution of real-time multi-tasking operations and data processing.

Hardware Specifications

Parameter Specification
Model MP213/E
Brand Bachmann
Origin Not specified
Weight 0.7 kg (1.54 lbs)
RAM 256 MB
Storage Interface Front side PC-Card slot

Profinet / EtherNet/IP Deterministic Networks

The MP213/E module leverages high backplane bus communication velocity to maintain tight synchronization across the M1 platform. By utilizing priority-scheduled multi-tasking, the processor ensures deterministic execution of control logic, making it suitable for high-density I/O configurations. I/O density scaling is managed through the module's capability to interface with diverse field modules, while firmware flash compatibility ensures that the operating system remains updated to support the latest industrial communication standards and hardware revisions.

Frequently Asked Questions

Q: Does the MP213/E support hot-swapping?

A: Hot-swapping the MP213/E while the rack is powered is not permitted. Ensure the system power is completely disconnected before inserting or removing the module to prevent damage to the backplane connectors.

Q: What is the purpose of the front-side PC-Card slot?

A: The PC-Card slot is designed for removable mass storage, enabling data logging, user program storage, or firmware updates to be performed locally at the rack level.

Q: How is the multitasking performance managed?

A: The module executes tasks based on a priority-scheduled multitasking algorithm, which allows for deterministic execution of critical control loops relative to lower-priority communication or diagnostic tasks.

Field Installation Guidelines

  1. Mounting: Ensure the module is fully seated within the M1 rack slot. Use the provided locking mechanisms to secure the module to the backplane, ensuring stable electrical contact.
  2. Grounding: The module chassis must be connected to the cabinet functional earth (FE). Ensure all contact surfaces are free of paint or oxidation to maintain a low-impedance ground path.
  3. Storage Handling: When inserting or removing PC-Cards, ensure the system is not actively accessing the memory device to prevent file system corruption or data loss.
  4. Environment: Install the module within an IP-rated enclosure to prevent exposure to dust and moisture, as the module relies on convective cooling through its housing.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Strategic Selection: Choosing the Right SCADA Software for Your PLC Project

Strategic Selection: Choosing the Right SCADA Software for Your PLC Project

In industrial automation, the SCADA (Supervisory Control and Data Acquisition) system acts as the bridge between raw machine data and actionable human intelligence. Selecting the incorrect software platform can lead to integration bottlenecks, scalability issues, and excessive long-term maintenance costs. As an automation consultant with 15 years of experience, I have guided many projects through the selection process. Below are the essential criteria for choosing a platform that ensures both performance and longevity.

Read more
Ensuring Operational Continuity: The Strategic Value of Redundant Automation Systems

Ensuring Operational Continuity: The Strategic Value of Redundant Automation Systems

In modern industrial landscapes, unplanned downtime is the ultimate adversary. For sectors relying on complex PLC and DCS architectures, a single hardware failure can trigger catastrophic production losses. Therefore, implementing redundant automation systems is no longer a luxury; it is a fundamental requirement for mission-critical operations. In this article, I analyze why redundancy remains the backbone of reliable industrial infrastructure.

Read more
Selecting the Right Cables for Industrial Automation: A Comprehensive Guide

Selecting the Right Cables for Industrial Automation: A Comprehensive Guide

Selecting the appropriate cabling infrastructure is critical for the success of any industrial automation project. Improper cable selection often leads to signal degradation, system instability, and costly downtime. As an automation engineer, I frequently see projects compromised by poor cabling choices in harsh industrial environments. This guide simplifies the complex landscape of cabling to help you make informed decisions for your PLC, DCS, and control systems.

Read more