Only 10 left - Selling fast

PRODUCT SKU : GM260

PRODUCT TYPE : Grid Measurement Modules

PRODUCT VENDOR : Bachmann


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-speed electrical network monitoring in M1 control platforms, the Bachmann GM260 (GM260 Grid Measurement Module) provides direct data acquisition of three-phase network variables.

Hardware Specifications

Parameter Specification
Model GM260
Brand Bachmann
Origin Austria
Dimensions Standard Bachmann module enclosure
Input Capacity 2 separate three-phase branches
Max Input Voltage 480 VAC (L-L) RMS
Harmonics Analysis Up to 40th harmonic

Profinet / EtherNet/IP Deterministic Networks

The GM260 module utilizes integrated processing to calculate True RMS grid variables online, ensuring the data provided to the deterministic network is cycle-time consistent. By computing harmonics up to the 40th order directly on the module, the load on the host CPU is minimized, facilitating efficient backplane bus communication velocity. The module integrates seamlessly with Bachmann SolutionCenter, allowing real-time access to active, apparent, and reactive power metrics. Firmware flash compatibility ensures that the grid calculation algorithms remain updated, providing accurate 4-quadrant energy counting within the M1 control environment.

Frequently Asked Questions

Q: Does the GM260 require external transducers for voltage measurement?

A: No. The module is designed to accept direct connections of input voltages up to 480 VAC (L-L) RMS, eliminating the need for intermediate voltage transducers in standard applications.

Q: How are energy values tracked within the module?

A: The module features 2 independent 4-quadrant (4Q) energy counters that are processed internally, ensuring precise energy monitoring without requiring external processing cycles.

Field Installation Guidelines

  1. Ensure all voltage and current connections are made in accordance with the local electrical safety standards and the module pinout diagram.
  2. Verify that the CT (Current Transformer) ratios are correctly configured in the SolutionCenter to ensure accurate current and power calculations.
  3. Utilize shielded cabling for all measurement inputs to prevent electromagnetic noise from interfering with the high-frequency harmonics sampling.
  4. Confirm that the common voltage monitoring point is correctly referenced to ground to prevent potential measurement offsets between the two three-phase branches.
  5. Perform an initial commissioning test using the SolutionCenter interface to verify that phase angles and RMS values align with secondary multimeter readings.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Strategic Selection: Choosing the Right SCADA Software for Your PLC Project

Strategic Selection: Choosing the Right SCADA Software for Your PLC Project

In industrial automation, the SCADA (Supervisory Control and Data Acquisition) system acts as the bridge between raw machine data and actionable human intelligence. Selecting the incorrect software platform can lead to integration bottlenecks, scalability issues, and excessive long-term maintenance costs. As an automation consultant with 15 years of experience, I have guided many projects through the selection process. Below are the essential criteria for choosing a platform that ensures both performance and longevity.

Read more
Ensuring Operational Continuity: The Strategic Value of Redundant Automation Systems

Ensuring Operational Continuity: The Strategic Value of Redundant Automation Systems

In modern industrial landscapes, unplanned downtime is the ultimate adversary. For sectors relying on complex PLC and DCS architectures, a single hardware failure can trigger catastrophic production losses. Therefore, implementing redundant automation systems is no longer a luxury; it is a fundamental requirement for mission-critical operations. In this article, I analyze why redundancy remains the backbone of reliable industrial infrastructure.

Read more
Selecting the Right Cables for Industrial Automation: A Comprehensive Guide

Selecting the Right Cables for Industrial Automation: A Comprehensive Guide

Selecting the appropriate cabling infrastructure is critical for the success of any industrial automation project. Improper cable selection often leads to signal degradation, system instability, and costly downtime. As an automation engineer, I frequently see projects compromised by poor cabling choices in harsh industrial environments. This guide simplifies the complex landscape of cabling to help you make informed decisions for your PLC, DCS, and control systems.

Read more