Skip to content

What are you looking for?


You may also like

Allen Bradley 1786-CTK ControlNet Coaxial Media Termination ToolkitAllen Bradley 1786-CTK ControlNet Coaxial Media Termination ToolkitAllen Bradley 1786-CTK ControlNet Coaxial Media Termination Toolkit
Allen Bradley 1786-CTK ControlNet Coaxial Media Termination Toolkit
Allen Bradley 1786-CTK ControlNet Coaxial Media Termination Toolkit
Allen Bradley 1786-CTK ControlNet Coaxial Media Termination Toolkit

Allen Bradley 1786-CTK ControlNet Coaxial Media Termination Toolkit


Only 10 left - Selling fast

PRODUCT SKU : 1786-CTK

PRODUCT TYPE : Termination Toolkit

PRODUCT VENDOR : Allen-Bradley


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Product Overview

The Allen Bradley 1786-CTK serves as a specialized Media Termination Toolkit for the ControlNet coaxial cabling system. This comprehensive kit provides all necessary precision tools to strip, crimp, and terminate RG-6 quad shield cables with professional-grade accuracy. It ensures that every connection meets the stringent signal integrity and mechanical durability standards required for high-speed industrial networks. We provide this toolkit as 100% Brand New and Original, containing factory-calibrated tools to prevent signal loss and physical connection failures in your control architecture.

Technical Specifications

The 1786-CTK facilitates high-performance cable preparation with the following parameters:

Component / Parameter Specification
Compatible Cable RG-6 Quad Shield Coaxial
Connector Protection IP67-rated (when properly terminated)
Pull Force Resistance 60 lbs minimum (withstand force)
Vibration Resistance 10 G @ 10 to 500 Hz
Operating Temperature -20°C to 70°C (-4°F to 158°F)
Tightening Torque 1 Newton-meter (0.74 lb-ft) for trunk lines
Shock Resistance 30 G (Operational) / 50 G (Non-operational)
Kit Weight 3.31 lbs (1.50 kg)

Engineering Advantages

The 1786-CTK addresses the mechanical and electrical complexities of industrial coaxial networking:

  • Precision Stripping Capability: The kit includes a dedicated cable strip tool featuring two distinct blade cassettes. One cassette handles Fluorinated Ethylene Propylene (FEP) plenum-rated jackets, while the other manages standard Polyvinyl Chloride (PVC) jackets. This ensures clean cuts without damaging the sensitive internal quad shielding.

  • Mechanical Integrity: Terminations performed with the included crimp and flare tools withstand a minimum pull force of 60 pounds. This robust mechanical grip prevents accidental disconnections caused by cable strain or equipment vibration during operation.

  • Environmental Sealing: The toolkit facilitates the installation of IP67-rated connectors. By following the guide and using the calibration tools, installers create watertight seals that protect the signal path from moisture, dust, and corrosive airborne contaminants.

  • Calibrated Tooling: The 1786-CTK eliminates guesswork during field installations. The calibration/flare tool prepares the cable dielectric and foil exactly to the depth required for standard ControlNet connectors, ensuring a low-impedance path and consistent 75-ohm impedance across the entire trunk line.

FAQs

  • What specific tools does the 1786-CTK kit include?

    The kit contains a professional wire cutter, a knife, a memory blade holder, a heavy-duty crimp tool, a calibration/flare tool, a cable strip tool with two blade cassettes, an installation guide, and an initial set of terminators and connectors.

  • Can I use this kit for standard RG-59 or RG-11 cables?

    No. This toolkit specifically targets RG-6 quad shield coaxial cable used in ControlNet media systems. Using these tools on other cable gauges will result in improper stripping and failed crimp connections.

  • Does this kit require a heat gun for termination?

    The termination process often requires heat-shrink tubing to seal the connector-to-cable transition. While the kit provides the connectors and guides, you must provide a separate heat gun to apply the tubing for environmental protection.

  • How do I confirm this toolkit is Brand New?

    We ship the 1786-CTK in its original Allen Bradley factory packaging. Each kit carries the authentic UPC (612598143849) and remains factory-sealed to ensure all precision blades and tools are sharp, unused, and within calibration.

 

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding SCADA vs. HMI: A Technical Guide for Industrial Automation

Understanding SCADA vs. HMI: A Technical Guide for Industrial Automation

In the world of factory automation, professionals often use the terms HMI and SCADA interchangeably. However, these systems serve distinct roles within a control hierarchy. Understanding their unique functions is vital for designing efficient industrial automation architectures.

Read more
Microcontroller vs. PLC: Choosing the Right Controller for Industrial Automation

Microcontroller vs. PLC: Choosing the Right Controller for Industrial Automation

Engineers have long sought the perfect balance between flexibility and reliability when controlling complex systems. Today, two primary technologies dominate the landscape: the Microcontroller and the Programmable Logic Controller (PLC). While both serve as the "brain" of a system, they cater to vastly different environments. Understanding their core differences is essential for designing efficient control systems.

Read more
Essential DCS Commissioning Steps for Industrial Plant Success

Essential DCS Commissioning Steps for Industrial Plant Success

DCS commissioning is the vital bridge between construction and production. This phase validates that industrial automation infrastructure meets its functional design, ensuring safety and long-term reliability. By following rigorous protocols, engineers successfully transition from hardware installation to live process control.

Read more