Skip to content

What are you looking for?


You may also like

Yokogawa SSC60D-F2542 CENTUM VP / ProSafe-RS Field Control Backplane UnitYokogawa SSC60D-F2542 CENTUM VP / ProSafe-RS Field Control Backplane UnitYokogawa SSC60D-F2542 CENTUM VP / ProSafe-RS Field Control Backplane Unit
Yokogawa SSC60D-F2542 CENTUM VP / ProSafe-RS Field Control Backplane Unit
Yokogawa SSC60D-F2542 CENTUM VP / ProSafe-RS Field Control Backplane Unit
Yokogawa SSC60D-F2542 CENTUM VP / ProSafe-RS Field Control Backplane Unit

Yokogawa SSC60D-F2542 CENTUM VP / ProSafe-RS Field Control Backplane Unit


Only 10 left - Selling fast

PRODUCT SKU : SSC60D-F2542

PRODUCT TYPE : Backplane Unit

PRODUCT VENDOR : Yokogawa


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Product Overview

The Yokogawa SSC60D-F2542 functions as the primary structural and electrical foundation for Field Control Stations (FCS) within CENTUM VP and ProSafe-RS architectures. This backplane unit facilitates high-speed data exchange and power distribution across multiple I/O and control modules. We supply this component as 100% Brand New and Original, ensuring absolute signal integrity and system uptime for mission-critical process automation in power, refining, and petrochemical facilities.

Technical Specifications

The SSC60D-F2542 utilizes precision-engineered circuitry to maintain stable communication across high-density module arrays.

Feature Specification Details
Compatible Systems Yokogawa CENTUM VP / ProSafe-RS
Slot Configuration 12 Module Slots (Control and I/O)
Supply Voltage 24 VDC Nominal
Communication Bus Vnet/IP or ESB Bus Connection
Mounting Type 19-inch Rack or Cabinet Mount
Dimensions 480 mm (W) × 200 mm (H) × 100 mm (D)
Operating Temperature 0°C to +55°C
Cooling Natural Convection
Condition 100% Brand New Original

Engineering Advantages

  • High-Density Logic Integration: The 12-slot architecture maximizes cabinet footprint efficiency. It allows engineers to consolidate control and I/O modules into a single 480mm width unit, reducing the overall number of required enclosures and simplifying internal cable management.

  • Native Redundancy Support: This backplane accommodates both redundant and non-redundant module pairs. It provides the necessary physical traces to sync dual-redundant controllers, ensuring the system maintains continuous operation even during a primary hardware failure.

  • Superior Signal Protection: The industrial-grade PCB material and alloy frame resist electromagnetic interference (EMI). This shielding ensures that high-speed data packets on the Vnet/IP or ESB bus remain free from corruption, even when installed near high-voltage switchgear.

  • Simplified Hot-Swap Maintenance: The precision-aligned slot connectors facilitate the rapid replacement of modules. Integrated diagnostics and LED status monitoring allow technicians to identify and swap faulty I/O units without disrupting the power or communication of neighboring modules on the same backplane.

FAQs

Does the SSC60D-F2542 support both CENTUM VP and ProSafe-RS modules simultaneously?

The backplane provides the physical interface compatible with both systems. However, system-specific bus protocols (Vnet/IP vs. ESB) and software licensing dictate the actual module mix. Always verify your specific station configuration within the Yokogawa engineering environment.

What are the grounding requirements for this backplane?

The SSC60D-F2542 requires a dedicated functional ground connection to the cabinet's busbar. Proper grounding prevents noise accumulation and protects the sensitive CMOS logic of the mounted I/O modules from electrostatic discharge (ESD).

Can I install this unit in a vertical orientation?

Yokogawa designs this unit for horizontal rack mounting to utilize natural convection cooling. Vertical installation may impede airflow across the mounted modules, potentially leading to thermal throttling or premature component aging in high-ambient environments.

Is this a refurbished or used "surplus" backplane?

Absolutely not. We provide only 100% Brand New original hardware. Each SSC60D-F2542 ships in its original factory packaging with intact anti-static protection and a verifiable serial number to guarantee authenticity and a full 10-year+ operational lifespan.

 

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Industrial control system deployments rely on structured signal distribution to bridge field instrumentation with central processing hardware. A marshalling cabinet serves as the vital intermediate connection point between heavy field home-run multi-pair cables and delicate input/output (I/O) modules housed inside Programmable Logic Controller (PLC) or Distributed Control System (DCS) enclosures. By segregating field cable terminations from control hardware, engineers maintain system flexibility, safeguard controller components, and streamline commissioning workflows.

Read more
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more