Skip to content

What are you looking for?


You may also like

Epro CON021/916-240 & PR6426/010-140 Eddy Current Sensor SystemEpro CON021/916-240 & PR6426/010-140 Eddy Current Sensor SystemEpro CON021/916-240 & PR6426/010-140 Eddy Current Sensor System
Epro CON021/916-240 & PR6426/010-140 Eddy Current Sensor System
Epro CON021/916-240 & PR6426/010-140 Eddy Current Sensor System
Epro CON021/916-240 & PR6426/010-140 Eddy Current Sensor System

Epro CON021/916-240 & PR6426/010-140 Eddy Current Sensor System


Only 10 left - Selling fast

PRODUCT SKU : CON021/916-240+PR6426/010-140

PRODUCT TYPE : Proximity Sensors

PRODUCT VENDOR : EMERSON


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-frequency vibration signal conditioning in turbomachinery monitoring systems, the Epro CON021/916-240 (CON021/916-240) converter paired with the PR6426/010-140 (PR6426/010-140) transducer provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model CON021/916-240 + PR6426/010-140
Brand Epro (Emerson)
Origin Germany
Weight 0.92 kg (Combined)
Dimensions Standard probe and LMgSi 0.5 F22 converter housing
Operating Temp -30 deg C to +175 deg C
Power Consumption Dependent on input voltage -21 VDC to -32 VDC
Measuring Range 24.0 mm
Accuracy +/- 1.5 % (Sensor sensitivity)
Output Signal -4 VDC to -20 VDC or -2 VDC to -18 VDC

Gap Voltage Validation (-10 VDC targets)

The system utilizes an oscillator circuit to drive the transducer probe. To ensure accurate linearization over the 24.0 mm extended measuring range, the system necessitates precise gap voltage validation. The converter centers its output characteristic around a nominal target of -10 VDC, which represents the mid-point of the physical measurement gap. Maintenance of this -10 VDC baseline is mandatory during static commissioning; significant deviations indicate mechanical misalignment, transducer saturation, or degradation of the conductive target surface.

Frequently Asked Questions

Q: Can the CON021/916-240 converter be used with shorter range sensors?

A: No. The converter is calibrated specifically for the 24.0 mm range of the PR6426 series. Using a different transducer will result in significant linearity errors exceeding the specified 3.5% threshold.

Q: Is the system capable of operating in pressurized environments?

A: The PR6426 sensor head is rated for pressure resistance up to 6,500 hPa (94 psi). Ensure the installation threads are sealed appropriately for the application pressure environment.

Field Installation Guidelines

  1. Mount the converter housing using four M5x20 screws onto a rigid, grounded surface to ensure structural integrity.
  2. Install the PR6426 probe into the mounting bracket, ensuring at least 200 mm shaft diameter clearance and adequate spacing from adjacent metallic structures to prevent cross-talk.
  3. Terminate the supply and output wiring using high-quality wire-end sleeves on the screw terminals, ensuring the cable conductor size does not exceed 1.5 mm².
  4. Verify the power supply polarity before applying voltage, as the unit requires -21 VDC to -32 VDC negative logic input.
  5. Ground the signal cable shield at the monitoring system (DCS/TSI) rack only to prevent ground-loop injection of 50/60 Hz electromagnetic noise.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

The transition of a Programmable Logic Controller (PLC) cabinet from a controlled factory floor to a volatile plant environment represents a critical milestone in factory automation. While a Factory Acceptance Test (FAT) validates standalone hardware compliance under ideal conditions, it cannot replicate real-world process dynamics. Therefore, deploying an industrial automation system requires a rigorous Site Acceptance Test (SAT) to verify total loop integrity, field wiring wiring metrics, and process control parameters before final customer handover.

Read more
Advanced Integration: Master Protocol for VFD Commissioning and Testing

Advanced Integration: Master Protocol for VFD Commissioning and Testing

Deploying variable frequency drives (VFDs) requires precise execution during the initial commissioning phase. Junior automation engineers often find the first power-up sequence intimidating. However, following a rigorous engineering framework ensures equipment safety and system reliability. Proper startup procedures protect both the drive electronics and the connected motor.

Read more
Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Variable Frequency Drives (VFDs) serve as critical assets in modern industrial automation. These power electronic devices regulate electric motors by adjusting the supplied frequency and voltage. Consequently, industries utilize VFDs to reduce energy consumption and optimize process control. Major manufacturers like Siemens, ABB, and Yaskawa design highly efficient drives. However, sustained efficiency requires a rigorous preventive maintenance program.

Read more