Skip to content

What are you looking for?


You may also like

PS01-B ICS Triplex Power Supply ModulesPS01-B ICS Triplex Power Supply ModulesPS01-B ICS Triplex Power Supply Modules
PS01-B ICS Triplex Power Supply Modules
PS01-B ICS Triplex Power Supply Modules
PS01-B ICS Triplex Power Supply Modules

PS01-B ICS Triplex Power Supply Modules


Only 10 left - Selling fast

PRODUCT SKU : PS01-B

PRODUCT TYPE : Power Supply Modules

PRODUCT VENDOR : ICS Triplex


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for continuous power delivery to the T8100 controller chassis in ICS Triplex Trusted safety instrumented systems, the ICS Triplex PS01-B (PS01-B Power Supply Module) provides direct physical/electrical execution. Operating on a nominal 24 VDC input and delivering a regulated 24 VDC output, this unit powers internal chassis logic rails and associated I/O modules across an operating temperature range of -40 to +85 deg C (-40 to +185 deg F).

Hardware Specifications

Parameter Specification
Model PS01-B
Brand ICS Triplex
Origin United Kingdom
Weight 6.5 kg (14.33 lbs)
Dimensions 112 mm x 70 mm x 123 mm
Operating Temp -40 to +85 deg C (-40 to +185 deg F)
Storage Temp -40 to +85 deg C (-40 to +185 deg F)
Humidity Range 10% to 90% RH non-condensing
Power Consumption Passive Power Conditioning (Internal Dissipation Dependent on Chassis Load)
Input Voltage 24 VDC
Output Voltage 24 VDC
System Compatibility ICS Triplex T8100 Controller Chassis & Associated Modules

Triple Modular Redundancy and Fail-Safe Execution

The ICS Triplex PS01-B power supply module is built to comply with SIL3 certification standards across high-availability safety instrumented platforms. Operating within a triple modular redundancy (TMR) 2oo3 architecture, the module incorporates internal galvanic isolation between the 24 VDC input lines, internal regulation logic, and chassis protective ground rail. Diagnostic monitoring subcircuits continuously audit voltage rails, initiating a fail-safe state execution upon detecting persistent over-voltage or under-voltage anomalies without compromising parallel active redundant power paths.

Frequently Asked Questions

Q: Can the PS01-B power supply module be hot-swapped while the T8100 controller chassis remains active?

A: Yes, in redundant power configurations, a faulted PS01-B module can be unseated and replaced without interrupting power to the backplane logic or running control applications.

Q: What is the primary operational difference between input and output grounding paths in the PS01-B unit?

A: Internal galvanic isolation maintains separation between the incoming 24 VDC field supply ground and the internal logic return path, preventing external electrical transients from corrupting safety controller operations.

Field Installation Guidelines

  1. Insert the PS01-B module into the designated power slot of the T8100 controller chassis using the top and bottom guide rails.
  2. Push the module firmly into the backplane connector until the front panel retention screws line up with the rack frame.
  3. Tighten the top and bottom retaining screws to establish structural chassis grounding and mechanical retention.
  4. Connect the 24 VDC supply wiring to the designated input terminal block, observing correct polarity and verifying protective earth (PE) grounding.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Wellhead Control Panel (WHCP) Architecture in Oil and Gas Automation

Wellhead Control Panel (WHCP) Architecture in Oil and Gas Automation

Upstream oil and gas operations rely on specialized field control platforms to manage wellhead extraction safety and hydraulic actuation. A Wellhead Control Panel (WHCP) serves as a dedicated hydraulic and pneumatic power unit designed to operate critical Christmas Tree isolation valves. By interfacing field safety components directly with Programmable Logic Controller (PLC) architecture, a WHCP protects upstream extraction assets against overpressure, catastrophic leaks, and thermal emergencies.

Read more
Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Industrial control system deployments rely on structured signal distribution to bridge field instrumentation with central processing hardware. A marshalling cabinet serves as the vital intermediate connection point between heavy field home-run multi-pair cables and delicate input/output (I/O) modules housed inside Programmable Logic Controller (PLC) or Distributed Control System (DCS) enclosures. By segregating field cable terminations from control hardware, engineers maintain system flexibility, safeguard controller components, and streamline commissioning workflows.

Read more
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more