Skip to content

What are you looking for?


You may also like

5466-352 | Woodward | Netcon CPU-040 Module5466-352 | Woodward | Netcon CPU-040 Module5466-352 | Woodward | Netcon CPU-040 Module
5466-352 | Woodward | Netcon CPU-040 Module
5466-352 | Woodward | Netcon CPU-040 Module
5466-352 | Woodward | Netcon CPU-040 Module

5466-352 | Woodward | Netcon CPU-040 Module


Only 10 left - Selling fast

PRODUCT SKU : 5466-352

PRODUCT TYPE : CPU Processors

PRODUCT VENDOR : Woodward


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-speed deterministic execution in turbine control platforms, the Woodward 5466-352 (5466-352 Netcon CPU-040 Module) provides direct physical/electrical execution of application logic via a 68030 microprocessor interface.

Hardware Specifications

Parameter Specification
Model 5466-352
Brand Woodward
Origin USA
Processor 68030 Microprocessor
Bus Interface VME Bus
Communication Dual-port RAM

Profinet / EtherNet/IP Deterministic Networks

The 5466-352 module manages deterministic task scheduling across the Netcon backplane. Communication between the 68030 microprocessor and the four network communication processors is handled via dual-ported RAM, ensuring high-speed data transfer and minimal jitter in execution cycles. The CPU enforces deterministic control by maintaining strict watchdog logic; upon detection of internal hardware faults, the module triggers an IOLOCK state. This state forces all output circuits and expansion racks into a de-energized condition, ensuring the system remains in a defined fail-safe state during processor or module failure.

Frequently Asked Questions

Q: What is the behavior of the system when an IOLOCK state is triggered?

A: When an IOLOCK state is triggered due to CPU or I/O module failure, all output circuits and signals are de-energized. This signal is propagated across all expansion racks to ensure the entire control system reaches a safe state.

Q: Can the CPU-040 be reset without cycling power to the entire system?

A: In simplex configurations, the CPU switch can be toggled to the reset position. If using the CPU reset button, the application will restart automatically, typically within 2 minutes. Ensure the application is stopped via AppManager on compatible CPU systems before initiating a manual reset.

Field Installation Guidelines

  1. Mounting: Seat the module into the designated VME slot within the Netcon chassis. Ensure the connector pins are aligned and the module is locked to maintain backplane contact.
  2. Backplane Interface: The CPU communicates via VME bus; ensure the chassis backplane is clean and free of debris to prevent communication errors between the 68030 and dual-ported RAM.
  3. Firmware Integrity: Verify firmware compatibility with existing I/O modules before initializing the application. Improper matching between the CPU firmware and I/O firmware may trigger false IOLOCK signals.
  4. Shielding: Ensure the control cabinet is properly grounded to mitigate electromagnetic interference, which can disrupt the VME bus data integrity.
  5. Validation: During initial deployment, monitor the watchdog status via the service panel to confirm the CPU has successfully synchronized with the communication processors and is executing the application logic.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more