Skip to content

What are you looking for?


You may also like

5A26137G01 | Westinghouse | Power Cable Harness5A26137G01 | Westinghouse | Power Cable Harness5A26137G01 | Westinghouse | Power Cable Harness
5A26137G01 | Westinghouse | Power Cable Harness
5A26137G01 | Westinghouse | Power Cable Harness
5A26137G01 | Westinghouse | Power Cable Harness

5A26137G01 | Westinghouse | Power Cable Harness


Only 10 left - Selling fast

PRODUCT SKU : 5A26137G01

PRODUCT TYPE : Power Cables

PRODUCT VENDOR : EMERSON


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for power signal distribution within Ovation control system architectures, the Westinghouse 5A26137G01 (5A26137G01-9 Power Distribution Cable) provides direct physical electrical execution for linking power supply outputs to backplane assemblies. The harness incorporates a 7-pin male connector interface, maintaining a standardized electrical path for supplying operating voltage to I/O nodes and controller peripherals.

Hardware Specifications

Parameter Specification
Model 5A26137G01
Brand Westinghouse
Weight 0.43 lbs
Dimensions 10 inches
Connector Type 7-pin Male

Process Control Connectivity and Signal Integrity

The 5A26137G01 is engineered to maintain low ohmic resistance for DC power transmission, reducing potential voltage drops between the power supply and the destination module. This harness facilitates the routing of operational power through the Ovation network. Consistent with process control standards, the physical connector design ensures secure mating to the backplane, minimizing the risk of contact resistance or intermittent power loss that could affect sensitive analog loop instrumentation or field bus integrity.

Frequently Asked Questions (FAQ)

Q: Is this cable assembly rated for use in hazardous area cabinets?

A: The harness is a passive interconnect component. When used in Class I Div. 2 or Zone 2 cabinets, ensure that all cable routing and termination methods comply with the local hazardous area installation codes and that the cable is not subjected to mechanical stress beyond its physical design.

Q: Can this cable be trimmed or modified for shorter routing?

A: Modification of the cable assembly, including shortening or altering connector terminations, is not recommended. Any alteration voids the physical integrity of the harness and may introduce voltage drops or intermittent connectivity issues into the power distribution bus.

Field Installation Guidelines

  1. Inspect the 7-pin male connector for any bent or recessed pins before installation.
  2. Ensure the cabinet power bus is de-energized prior to connecting the harness to prevent accidental short-circuits.
  3. Align the connector keyway with the corresponding backplane receptacle and press firmly until the locking mechanism is seated.
  4. Secure the cable using cable ties or wireway clips to ensure there is no strain on the connector during cabinet operation or vibration.
  5. Verify output voltage at the destination module terminals after installation to confirm a stable connection is established.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Evolving SCADA System Architectures in Industrial Automation

Evolving SCADA System Architectures in Industrial Automation

A robust Supervisory Control and Data Acquisition (SCADA) system serves as the heartbeat of modern industrial operations. Understanding SCADA system architecture is vital for engineers designing efficient control systems. These architectures have evolved from isolated, monolithic structures to highly interconnected, networked ecosystems. Choosing the right design requires balancing data visibility, processing power, and long-term scalability requirements.

Read more
Choosing the Right Controller: PLC vs. Motion Controller in Industrial Automation

Choosing the Right Controller: PLC vs. Motion Controller in Industrial Automation

Selecting the optimal control architecture is a foundational decision in industrial automation. Engineers must frequently choose between a Programmable Logic Controller (PLC) and a dedicated Motion Controller. While both systems manage machinery, their underlying design philosophies differ significantly, impacting performance, scalability, and system integration.

Read more
Mastering PLC Power Supply Architectures and Operating Voltages

Mastering PLC Power Supply Architectures and Operating Voltages

Selecting the correct operating voltage is a critical step in designing reliable industrial automation systems. Whether you are working with a compact PLC or a large-scale DCS, your power architecture dictates the system's longevity. In this guide, we explore the standard voltage ranges and power distribution strategies required to maintain stable factory automation operations.

Read more