Skip to content

What are you looking for?


You may also like

ABB HAC807A201 3BHE028767R0201 Control Drive ModuleABB HAC807A201 3BHE028767R0201 Control Drive ModuleABB HAC807A201 3BHE028767R0201 Control Drive Module
ABB HAC807A201 3BHE028767R0201 Control Drive Module
ABB HAC807A201 3BHE028767R0201 Control Drive Module
ABB HAC807A201 3BHE028767R0201 Control Drive Module

ABB HAC807A201 3BHE028767R0201 Control Drive Module


Only 10 left - Selling fast

PRODUCT SKU : HAC807A01 3BHE028767R0101

PRODUCT TYPE : Control Modules

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for motion regulation in industrial control networks, the ABB HAC807A201 (3BHE028767R0201 Control Drive Module) provides direct physical signal execution and real-time process monitoring.

Hardware Specifications

Parameter Specification
Model HAC807A201
Brand ABB
Part Number 3BHE028767R0201
Weight 0.2 kg
Dimensions 110 mm x 60 mm x 23 mm
Operating Temp -20 deg C to +70 deg C
Power Consumption 20 W
Input Voltage 24 V DC
Protection Class IP67

Profinet / EtherNet/IP deterministic networks

The HAC807A201 utilizes a deterministic backplane bus communication velocity architecture to synchronize control tasks with host processing units. This ensures low-latency execution of motion commands and feedback loops. Firmware flash compatibility is governed by the specific revision of the control platform; users must verify that the system firmware supports the module's register map to avoid communication bus conflicts. The module includes internal self-diagnostic routines that monitor bus signal integrity and output status. If network jitter exceeds threshold limits, the module initiates a hardware-level trap to protect downstream actuators.

Frequently Asked Questions

Q: Does this module support hot-swapping during active drive operation?

A: No. Any hardware removal or insertion must be performed while the system power is completely disconnected to prevent electrical damage to the backplane communication bus and internal logic components.

Q: Is the module firmware field-upgradable?

A: Yes, firmware updates are supported via the host controller interface. Ensure the controller is in a maintenance state before initiating the flash process to prevent data corruption.

Field Installation Guidelines

  • Mounting: Given the IP67 protection rating, ensure the module is mounted using the designated enclosure points. Verify that the sealing gasket is clean and free of debris to maintain environmental integrity.
  • Grounding: The module chassis must be connected to the cabinet common ground to ensure EMC compliance. Use a low-impedance conductor to minimize noise coupling from high-power drive stages.
  • Cable Integrity: Use shielded twisted-pair cabling for all signal connections. Ensure the shield is terminated at the cabinet entry point to suppress electromagnetic interference (EMI).
  • Thermal Management: While the unit is designed for a broad temperature range (-20 deg C to +70 deg C), avoid installation near concentrated heat sources that exceed the upper limit to prevent degradation of internal components.
  • Wiring Verification: Before applying 24 V DC power, perform a continuity test on input wiring to confirm the absence of short circuits to the chassis.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more