Skip to content

What are you looking for?


You may also like

Emerson KJ3243X1-BK1 S-Series Profibus DP Interface CardEmerson KJ3243X1-BK1 S-Series Profibus DP Interface CardEmerson KJ3243X1-BK1 S-Series Profibus DP Interface Card
Emerson KJ3243X1-BK1 S-Series Profibus DP Interface Card
Emerson KJ3243X1-BK1 S-Series Profibus DP Interface Card
Emerson KJ3243X1-BK1 S-Series Profibus DP Interface Card

Emerson KJ3243X1-BK1 S-Series Profibus DP Interface Card


Only 10 left - Selling fast

PRODUCT SKU : KJ3243X1-BK1

PRODUCT TYPE : Serial Interface Module

PRODUCT VENDOR : EMERSON


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-speed fieldbus synchronization in DeltaV distributed control architectures, the Emerson KJ3243X1-BK1 (KJ3243X1-BK1 Profibus DP Interface Card) provides direct physical/electrical execution. This communication module processes external cyclic and acyclic data frames from remote field instruments, mapping distributed network addresses onto the localized backplane system register configuration for central controller access.

Hardware Specifications

Parameter Specification
Model KJ3243X1-BK1
Brand Emerson
Origin USA
Weight 0.35 kg
Dimensions Standard DeltaV S-Series module footprint
Operating Temp -40 deg C to +70 deg C
Power Consumption 12 VDC at 600 mA (Local Bus Power)
Interface Network Profibus DP (Decentralized Periphery)
Subassembly Coding Terminal Block key position D3
Shock Resistance 10g 1/2 sine wave for 11 ms
Vibration Resistance 1 mm peak-to-peak from 2 to 13.2 Hz; 0.7g from 13.2 to 150 Hz
Airborne Contaminants ISA-S71.04-1985 Airborne Contaminants Class G3
Relative Humidity 5% to 95% non-condensing

Distributed Process Fieldbus Connectivity

Mechanical execution of this S-Series network card utilizes integrated transceivers to govern data transport rates over industrial lines. The hardware layer establishes dedicated FOUNDATION Fieldbus / Profibus PA connectivity and Profibus DP protocol integration through localized channel-to-channel isolation barriers. This localized electronic separation stops ground potential shifts or transient electromagnetic interference generated along long external cable links from cross-talking into parallel instrumentation loops or corrupting backplane communication frames.

Frequently Asked Questions

Q: Does this Profibus DP communication interface card support live hot-swap replacement procedures?

A: Yes. The hardware contains localized power-limiting tracking paths that allow online insertion and extraction without de-energizing the main carrier rail or disrupting parallel processing modules on the network.

Q: What is the mechanical function of the designated D3 key configuration?

A: The D3 mechanical key profile secures physical alignment with the matching terminal block matrix, blocking the connection of incompatible hardware variants to prevent interface destruction.

Field Installation Guidelines

  • Carrier Track Alignment: Place the module interface guides squarely over the intended slot of the S-Series carrier baseplate. Apply steady force downward until the integrated retention clips lock onto the tracking rails.

  • Network Cable Termination: Attach the shielded twisted-pair Profibus cable lines to the matching terminal block. Torque all connection screws down to standard limits to avoid signal reflection losses from high contact resistance.

  • Shield Grounding Matrix: Ground all communication cable shield layers at the centralized marshalling panel common earth bus bar. This single-point grounding configuration suppresses external common-mode noise propagation across data channels.

  • Bus Termination Maintenance: Verify that active network termination resistors are switched to the on position strictly at the first and last physical nodes of the bus layout to ensure stable transmission line impedance.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Industrial control system deployments rely on structured signal distribution to bridge field instrumentation with central processing hardware. A marshalling cabinet serves as the vital intermediate connection point between heavy field home-run multi-pair cables and delicate input/output (I/O) modules housed inside Programmable Logic Controller (PLC) or Distributed Control System (DCS) enclosures. By segregating field cable terminations from control hardware, engineers maintain system flexibility, safeguard controller components, and streamline commissioning workflows.

Read more
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more