Skip to content

What are you looking for?


You may also like

DS200SLCCG3ADC | General Electric | LAN Communication CardDS200SLCCG3ADC | General Electric | LAN Communication CardDS200SLCCG3ADC | General Electric | LAN Communication Card
DS200SLCCG3ADC | General Electric | LAN Communication Card
DS200SLCCG3ADC | General Electric | LAN Communication Card
DS200SLCCG3ADC | General Electric | LAN Communication Card

DS200SLCCG3ADC | General Electric | LAN Communication Card


Only 10 left - Selling fast

PRODUCT SKU : DS200SLCCG3ADC

PRODUCT TYPE : Communication Modules

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for network interfacing within Mark V drive and turbine control platforms, the GE DS200SLCCG3ADC (DS200SLCCG3 LAN Communication Card) provides direct physical data exchange and local control processing.

Hardware Specifications

Parameter Specification
Model DS200SLCCG3ADC
Brand General Electric
Origin Not specified
Core Components Integrated LAN control processor (LCP), 2 EPROM memory cartridges

Industrial Control & Firmware Compatibility

The DS200SLCCG3ADC utilizes an integrated LAN Control Processor (LCP) to manage data exchange via dual-ported RAM. For deterministic system performance, backplane bus communication velocity must be verified against the host drive control board requirements. Firmware flash compatibility is governed by the two onboard replaceable EPROM cartridges; these must maintain revision parity with the drive control board software to ensure stable network signal filtering. The module supports both isolated and non-isolated signal paths, requiring adherence to grounding standards to maintain I/O density scaling without introducing electrical noise into the communication bus.

Frequently Asked Questions

Q: How is the communication interface established between the card and the host controller?

A: The card utilizes dual-ported RAM to buffer data between the LCP and the drive control processor. This configuration allows simultaneous memory access, facilitating high-speed communication without external polling cycles.

Q: Is the onboard keypad required for module operation?

A: The detachable alphanumeric keypad is a tool for local diagnostic access and configuration. It is not required for the card to execute its primary communication functions, but it provides the interface for viewing system control settings and diagnostics.

Field Installation Guidelines

  • Physical Seating: Ensure the module is securely inserted into the designated drive cabinet slot. Check for complete engagement of all pins to prevent communication errors or intermittent signal drops.
  • Shielding and Grounding: The board features both isolated and non-isolated circuits. Ensure proper termination of all cable shields at the cabinet entrance to prevent electromagnetic interference (EMI) from degrading the LCP signal filtering.
  • Memory Maintenance: Use ESD-safe procedures when handling EPROM cartridges. Ensure cartridges are firmly seated in their respective sockets (U6/U7) to maintain logic integrity.
  • Diagnostic Check: Post-installation, attach the keypad to verify the card's initialization status. Use the provided test points to validate voltage levels if communication handshaking fails during system startup.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more