Skip to content

What are you looking for?


You may also like

Honeywell CC-KREB02 51202705-153 PLC PC Communication CableHoneywell CC-KREB02 51202705-153 PLC PC Communication CableHoneywell CC-KREB02 51202705-153 PLC PC Communication Cable
Honeywell CC-KREB02 51202705-153 PLC PC Communication Cable
Honeywell CC-KREB02 51202705-153 PLC PC Communication Cable
Honeywell CC-KREB02 51202705-153 PLC PC Communication Cable

Honeywell CC-KREB02 51202705-153 PLC PC Communication Cable


Only 10 left - Selling fast

PRODUCT SKU : 51202705-153 CC-KREB02

PRODUCT TYPE : Communication Cable

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Overview

The Honeywell CC-KREB02 (51202705-153) is a 50-pin PLC communication cable designed to connect Honeywell PLCs with distributed control systems (DCS). Built for industrial-grade reliability, this cable ensures accurate data transmission and signal integrity across control networks.

Features

  • Reliable Connectivity: Provides stable data and control signal exchange between PLC and DCS systems.

  • Industrial Durability: Designed to operate in demanding plant environments with consistent electrical performance.

  • High Compatibility: Supports Honeywell control and automation systems, ensuring seamless integration.

  • Flexible Use: Suitable for data communication, configuration, and system diagnostics.

  • Lightweight Design: Compact construction for ease of installation and cable management.

Technical Specifications

  • Model Number: CC-KREB02

  • Part Number: 51202705-153

  • Product Type: PLC Communication Cable

  • Connector Type: 50-pin interface

  • Cable Function: Data and control signal transmission between PLC and DCS

  • Operating Environment: Industrial control and automation systems

  • Weight: 0.2 kg

  • Country of Origin: United States

  • Warranty: 12 months

Applications

Ideal for process control systems, automation setups, and communication between Honeywell PLC and supervisory systems in sectors such as oil and gas, manufacturing, and utilities.

FAQ

Q: Is the CC-KREB02 compatible with all Honeywell PLC models?
A: The CC-KREB02 is designed for use with most Honeywell PLC and DCS architectures supporting 50-pin communication interfaces.

Q: What is the primary function of this cable?
A: It facilitates reliable signal transmission and data synchronization between PLC and control systems.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Mastering Modern Industrial Joystick Controls in Heavy Automation

Mastering Modern Industrial Joystick Controls in Heavy Automation

Industrial joysticks play a pivotal role in human-machine interaction across heavy material handling and mobile hydraulics. These tactile controllers translate complex operator movements into precise electrical signals for PLCs, motion controllers, and DCS networks. Consequently, selecting and installing the right joystick architecture ensures operator safety, reduces fatigue, and optimizes equipment performance.

Read more
Navigating Industrial Automation Failures: Types, Causes, and Mitigation Strategies

Navigating Industrial Automation Failures: Types, Causes, and Mitigation Strategies

Modern manufacturing relies heavily on automated control systems to maximize throughput and maintain product quality. However, unplanned downtime in industrial automation can cost facility operators thousands of dollars per hour. Understanding how programmable logic controllers (PLCs), distributed control systems (DCS), and field instrumentation fail empowers engineering teams to implement robust preventive maintenance strategies.

Read more
Essential Motion Control Commands: A Practical Guide for Engineers

Essential Motion Control Commands: A Practical Guide for Engineers

Automation engineers often rely on precise position and speed control to drive modern factory machinery. Modern industrial systems, such as Programmable Logic Controllers (PLCs) and Distributed Control Systems (DCS), depend heavily on standardized motion instructions. Mastering these commands ensures operational safety, protects mechanical components, and optimizes cycle times across production lines.

Read more