Product Details
Configured for high-speed logic execution in M1 automation platforms, the Bachmann MP213/E (MP213/E PLC Module) provides direct physical/electrical execution of real-time multi-tasking operations and data processing.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | MP213/E |
| Brand | Bachmann |
| Origin | Not specified |
| Weight | 0.7 kg (1.54 lbs) |
| RAM | 256 MB |
| Storage Interface | Front side PC-Card slot |
Profinet / EtherNet/IP Deterministic Networks
The MP213/E module leverages high backplane bus communication velocity to maintain tight synchronization across the M1 platform. By utilizing priority-scheduled multi-tasking, the processor ensures deterministic execution of control logic, making it suitable for high-density I/O configurations. I/O density scaling is managed through the module's capability to interface with diverse field modules, while firmware flash compatibility ensures that the operating system remains updated to support the latest industrial communication standards and hardware revisions.
Frequently Asked Questions
Q: Does the MP213/E support hot-swapping?
A: Hot-swapping the MP213/E while the rack is powered is not permitted. Ensure the system power is completely disconnected before inserting or removing the module to prevent damage to the backplane connectors.
Q: What is the purpose of the front-side PC-Card slot?
A: The PC-Card slot is designed for removable mass storage, enabling data logging, user program storage, or firmware updates to be performed locally at the rack level.
Q: How is the multitasking performance managed?
A: The module executes tasks based on a priority-scheduled multitasking algorithm, which allows for deterministic execution of critical control loops relative to lower-priority communication or diagnostic tasks.
Field Installation Guidelines
- Mounting: Ensure the module is fully seated within the M1 rack slot. Use the provided locking mechanisms to secure the module to the backplane, ensuring stable electrical contact.
- Grounding: The module chassis must be connected to the cabinet functional earth (FE). Ensure all contact surfaces are free of paint or oxidation to maintain a low-impedance ground path.
- Storage Handling: When inserting or removing PC-Cards, ensure the system is not actively accessing the memory device to prevent file system corruption or data loss.
- Environment: Install the module within an IP-rated enclosure to prevent exposure to dust and moisture, as the module relies on convective cooling through its housing.
Additional Information
- 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
- 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
- 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
- Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
- Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
- Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.































