Skip to content

What are you looking for?


You may also like

VF311 | Yokogawa | CENTUM V-Net Input/Output ModuleVF311 | Yokogawa | CENTUM V-Net Input/Output ModuleVF311 | Yokogawa | CENTUM V-Net Input/Output Module
VF311 | Yokogawa | CENTUM V-Net Input/Output Module
VF311 | Yokogawa | CENTUM V-Net Input/Output Module
VF311 | Yokogawa | CENTUM V-Net Input/Output Module

VF311 | Yokogawa | CENTUM V-Net Input/Output Module


Only 10 left - Selling fast

PRODUCT SKU : VF311

PRODUCT TYPE : I/O Module

PRODUCT VENDOR : Yokogawa


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Product Overview

The Yokogawa VF311 functions as a high-performance Input/Output interface designed specifically for the CENTUM Distributed Control System (DCS). This module utilizes Yokogawa's proprietary V-Net communication protocol to establish a deterministic data link between field instrumentation and the control station. It manages real-time signal processing and ensures synchronized data flow across the automation network, making it a critical component for complex process control applications.

Technical Specifications

The VF311 combines a slim physical profile with high-integrity communication capabilities:

Feature Specification
Manufacturer Yokogawa
Model VF311
Function Input/Output Module
Communication Protocol Yokogawa Proprietary V-Net
Dimensions 1.9 cm x 26.7 cm x 25.4 cm (0.8" x 10.5" x 10.0")
Weight 0.4 kg (14.1 oz)
Condition 100% Brand New and Original

Engineering Advantages

  • Optimized V-Net Throughput: The VF311 leverages the V-Net protocol to deliver millisecond-level signal updates. This deterministic architecture prevents data collisions and ensures that critical process variables reach the controller within fixed scan times, enhancing the stability of high-speed control loops.

  • Space-Efficient Design: With a width of only 1.9 cm (0.8"), the VF311 maximizes slot density within the I/O nest. This slim form factor allows engineers to install more I/O channels in a single marshalling cabinet, effectively reducing the total hardware footprint and associated enclosure costs.

  • Seamless DCS Integration: Yokogawa specifically engineered this module to plug directly into CENTUM V-Net backplanes. It requires minimal software configuration, allowing for rapid hot-swapping or system expansion without interrupting the broader control network.

  • Low Power Consumption: The internal circuitry minimizes heat dissipation while maintaining signal integrity. This thermal efficiency protects adjacent modules from overheating in non-ventilated cabinets, extending the overall MTBF (Mean Time Between Failures) of the system.

FAQs

  • Is this Yokogawa VF311 unit brand new?

    Yes. We supply the VF311 strictly as 100% Brand New and Original equipment. Every module ships in its original Yokogawa factory packaging with the manufacturer’s quality control seals intact.

  • What systems are compatible with the VF311?

    The VF311 integrates specifically with Yokogawa systems utilizing the V-Net proprietary bus. Always verify your specific Field Control Station (FCS) model and firmware version to ensure full communication compatibility.

  • How does the V-Net protocol improve system performance?

    Unlike standard Ethernet, V-Net provides a deterministic communication path. It guarantees a fixed time for data transmission, which is essential for safety-critical and high-precision control loops that cannot tolerate the unpredictable latencies of open networks.

  • Does the VF311 require external termination?

    Termination requirements depend on the module's position within the V-Net loop. Typically, the backplane handles termination, but you should refer to your system's network topology diagram to confirm if your specific installation requires an external terminator.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Industrial automation relies heavily on programmable logic controllers (PLCs) to manage complex manufacturing processes. Many engineers dive straight into programming without mastering the underlying architecture. However, understanding how a PLC CPU executes a program ensures reliable system design. Therefore, mastering the scan cycle optimizes both performance and troubleshooting in modern control systems.

Read more
How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

Establishing a reliable hardware link between a programming terminal and a Siemens SIMATIC controller is essential for engineering workflows. Field engineers rely on distinct physical layers, ranging from legacy serial connections to high-speed Industrial Ethernet protocols. Modern factory automation environments prioritize fast data transfer and seamless driver integration. Selecting the correct connection method simplifies program downloads, online monitoring, and system troubleshooting in complex control systems.

Read more
Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Modern manufacturing is undergoing a rapid technological transformation driven by Industry 4.0 innovations. Technologies like Artificial Intelligence (AI), Machine Learning (ML), and the Industrial Internet of Things (IIoT) are dominating discussions across the factory automation sector. Consequently, many engineers wonder if these advanced digital tools will eventually replace traditional Programmable Logic Controllers (PLCs). However, evaluating the core physics of industrial operations reveals a very different reality for control systems.

Read more