Product Details
The Yokogawa MAC2*B, also cataloged as the MAC2 Analog Control Board, operates as a dedicated hardware component for multi-loop analog signal conditioning and process variable control within Yokogawa CENTUM DCS platforms. The card manages multiple independent analog I/O channels, executing real-time signal conversion and loop execution between field instruments and central process controllers across the rack backplane.
Suffix Breakdown & Model Matrix
| Code Element | Specification / Description |
|---|---|
| MAC2 | Base model designation for multipoint analog control card/board series |
| *B | Style code Revision B specifying terminal interface configuration and hardware assembly revision |
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | MAC2*B |
| Brand | Yokogawa |
| Origin | Japan |
| Weight | 0.7 kg |
| Dimensions | Standard CENTUM nest card format |
| Operating Temp | 0 deg C to 50 deg C |
| Power Consumption | 24 VDC +/-10% |
| Signal Conditioning | Multi-channel analog input and output conversion |
| Loop Signal Range | 4-20 mA DC / 1-5 V DC analog process loops |
| System Integration | Yokogawa CENTUM DCS Series |
Channel-to-Channel Isolation and DCS Process Loop Control
The MAC2*B analog control board processes analog signal loops across the CENTUM DCS system backplane. Featuring galvanic channel-to-channel isolation, the hardware decouples individual process variable channels to suppress ground loop currents and common-mode electrical noise. The board conditions 4-20 mA HART loop protocol signals and analog inputs—such as pressure, flow, and temperature variables—converting physical field measurements into digitized values for continuous closed-loop DCS execution without channel crosstalk.
Frequently Asked Questions
Q: What is the primary function of channel-to-channel isolation on the MAC2*B board?
A: Individual galvanic channel isolation eliminates ground loop pathways between field transmitters and the DCS backplane, preventing common-mode noise from corrupting signal conversion on adjacent channels.
Q: What supply voltage range is required to power the MAC2*B analog control board?
A: The board operates from a nominal 24 VDC supply with an allowable voltage tolerance of +/-10% (21.6 VDC to 26.4 VDC).
Q: How are field signal cables terminated to the board assembly?
A: Signal wiring connects via screw terminal blocks on the designated card nest, which routes process signals directly to the backplane edge connector of the MAC2*B board.
Field Installation Guidelines
- Board Mounting: Slide the MAC2*B board vertically into the guide rails of the designated CENTUM card nest slot. Press firmly until the rear connector seats into the backplane, then lock top and bottom retaining fasteners.
- Signal Cabling: Route 4-20 mA loop cables using twisted shielded pair wiring. Maintain at least 300 mm separation from high-voltage AC conductors to prevent inductive noise coupling.
- Shield Termination: Ground cable shield drain wires at a single point on the cabinet functional earth (FE) bus bar. Do not connect shields to ground at both the field instrument and DCS panel ends.
- Power Supply Verification: Measure backplane power rail voltage under full loop load to confirm supply remains within 21.6 VDC to 26.4 VDC operating limits before loop commissioning.
Additional Information
- 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
- 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
- 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
- Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
- Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
- Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.





























