Skip to content

What are you looking for?


You may also like

Honeywell 05701-A-0502 System 57 Control Rack AssemblyHoneywell 05701-A-0502 System 57 Control Rack AssemblyHoneywell 05701-A-0502 System 57 Control Rack Assembly
Honeywell 05701-A-0502 System 57 Control Rack Assembly
Honeywell 05701-A-0502 System 57 Control Rack Assembly
Honeywell 05701-A-0502 System 57 Control Rack Assembly

Honeywell 05701-A-0502 System 57 Control Rack Assembly


Only 10 left - Selling fast

PRODUCT SKU : SPS5710 51198685-100

PRODUCT TYPE : Control Rack Assembly

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Product Overview

The Honeywell 05701-A-0502 comprises a specialized 6U high, half 19-inch wide control rack assembly engineered for the System 57 gas and safety monitoring architecture. This localized chassis provides the physical foundation and electrical backplane required to consolidate engineering cards, signal inputs, and control modules into a unified safety node.

We supply this assembly exclusively as a 100% brand new, original factory-sealed kit to ensure perfect backplane pin alignment and complete structural integrity for high-integrity industrial safety environments.

Technical Specifications

The system hardware integrates the following exact physical components and layout configurations:

Parameter / Component System Configuration Details
Manufacturer HONEYWELL
Part Number 05701-A-0502
Product Type Control Rack Assembly (System 57 Series)
Chassis Dimensions Standard Half 19-inch width × 6U vertical height
Wiring Access Profile Optimized exclusively for front field wiring connections
Net Weight 2.8 Kg (6.17 lbs)
Included Sub-Components Structural Sub-rack, Engineering Card, DC Input Card, Key Kit, Interconnecting Cable

Engineering Advantages

  • Optimizes Tight Cabinet Layouts: The half 19-inch 6U footprint maximizes spatial efficiency inside crowded control cabinets. This compact format allows engineering teams to install multi-channel safety systems adjacent to existing PLC blocks without expanding the external enclosure footprint.

  • Accelerates Termination and Loop Checks: The front-facing field wiring design eliminates the need to access the rear of the rack during commissioning. Field technicians terminate all sensor lines, power leads, and relay contacts directly from the front panel, significantly reducing startup hours and simplify troubleshooting.

  • Guarantees Signal and Power Distribution Integrity: The included interconnecting cable and specialized DC input card work in tandem to eliminate inductive voltage drops across the backplane. This hardwired power architecture maintains clean voltage rails for every slotted engineering card, preventing channel-to-channel cross-talk and nuisance alarms.

FAQs

  • What components ship inside this complete 05701-A-0502 kit?

    This kit provides a comprehensive out-of-the-box hardware solution. It contains the standard half-19 inch 6U sub-rack, the master engineering card, the dedicated DC input card, a module keying kit to prevent incorrect board insertion, and the necessary heavy-gauge interconnecting cable.

  • How does the front field wiring layout affect installation depth requirements?

    Because all field terminations occur at the front face, you do not need wide maintenance clearances behind the rack frame. However, you must factor in the bend radius of your incoming multi-core field cables at the front of the 6U panel to ensure the cabinet outer door closes smoothly without stressing the terminal blocks.

  • Does this brand-new unit require specific slot keying before inserting existing System 57 cards?

    Yes. You must use the included key kit to configure the mechanical slots to match your specific card layout (such as 5701 gas control cards). Mechanical keying prevents operators from accidentally sliding a card into the wrong slot during live operations, which safeguards internal electronics from mismatched pin voltages.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Industrial automation relies heavily on programmable logic controllers (PLCs) to manage complex manufacturing processes. Many engineers dive straight into programming without mastering the underlying architecture. However, understanding how a PLC CPU executes a program ensures reliable system design. Therefore, mastering the scan cycle optimizes both performance and troubleshooting in modern control systems.

Read more
How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

Establishing a reliable hardware link between a programming terminal and a Siemens SIMATIC controller is essential for engineering workflows. Field engineers rely on distinct physical layers, ranging from legacy serial connections to high-speed Industrial Ethernet protocols. Modern factory automation environments prioritize fast data transfer and seamless driver integration. Selecting the correct connection method simplifies program downloads, online monitoring, and system troubleshooting in complex control systems.

Read more
Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Modern manufacturing is undergoing a rapid technological transformation driven by Industry 4.0 innovations. Technologies like Artificial Intelligence (AI), Machine Learning (ML), and the Industrial Internet of Things (IIoT) are dominating discussions across the factory automation sector. Consequently, many engineers wonder if these advanced digital tools will eventually replace traditional Programmable Logic Controllers (PLCs). However, evaluating the core physics of industrial operations reveals a very different reality for control systems.

Read more