Skip to content

What are you looking for?


You may also like

HIMA F 3421 8-Channel Digital Output Module Safety-Related Discrete UnitHIMA F 3421 8-Channel Digital Output Module Safety-Related Discrete UnitHIMA F 3421 8-Channel Digital Output Module Safety-Related Discrete Unit
HIMA F 3421 8-Channel Digital Output Module Safety-Related Discrete Unit
HIMA F 3421 8-Channel Digital Output Module Safety-Related Discrete Unit
HIMA F 3421 8-Channel Digital Output Module Safety-Related Discrete Unit

HIMA F 3421 8-Channel Digital Output Module Safety-Related Discrete Unit


Only 10 left - Selling fast

PRODUCT SKU : F3421

PRODUCT TYPE : Digital Output Module

PRODUCT VENDOR : Hima


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Technical Overview

The F 3421 (Part Number: F3421) is a high-performance digital output module engineered for the HIMA HIMatrix system, providing eight safety-related channels for industrial automation. This module is specifically designed to control safety-critical actuators, valves, and contactors in environments requiring SIL 3 compliance. It features advanced internal diagnostics and short-circuit protection, ensuring that the "safe state" is maintained even in the event of an external field fault.

Detailed Specifications

The following technical data outlines the electrical and mechanical performance of the F 3421 unit:

  • Output Capacity: 8 Safety-related digital channels

  • Nominal Voltage: 24 V DC

  • Output Current: Up to 0.5 A per channel (short-circuit proof)

  • Safety Integrity Level: Certified up to SIL 3 / PLe

  • Switching Logic: High-side switching with integrated wire-breakage monitoring

  • Galvanic Isolation: Safety isolation between the system bus and field level

  • Current Consumption: Approximately 50 mA at 24 V DC (internal electronics)

  • Dimensions: 2 cm x 18.8 cm x 12.8 cm

  • Net Weight: 0.18 kg

  • Manufacturing Origin: Germany

  • Protection Class: IP20-rated for cabinet installation

Functional Logic and Protection

The F 3421 is built to handle the rigors of emergency shutdown (ESD) and Fire and Gas (F&G) systems. Key functional features include:

  • Active Diagnostics: Continuous monitoring of the output stage for cross-circuit and external voltage interference.

  • Failure Response: In the event of a logic error or communication loss, the module automatically forces all outputs to a de-energized "safe" state.

  • Thermal Protection: Each channel is equipped with thermal shutdown capabilities to prevent module damage during overcurrent events.

Frequently Asked Questions

Does the F 3421 require external fusing for each channel?While the F3421 features electronic short-circuit protection, HIMA typically recommends external fusing for line protection depending on the cable cross-section and local safety regulations.

Can I parallel multiple outputs to increase the current load?Generally, safety modules like the F3421 are not designed for paralleling outputs to drive a single high-current load, as this can interfere with the diagnostic testing pulses used for safety monitoring.

Product Family Comparison

  • F3421: 8 digital outputs, 0.5 A per channel, standard HIMatrix form factor.

  • F3422: High-current variant often supporting up to 2 A per output for driving larger solenoids.

  • F3221: Digital input counterpart used for signal acquisition from field switches.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more