Skip to content

What are you looking for?


You may also like

GE IS420UCSCH1C Mark VIe Quad Core Controller ModuleGE IS420UCSCH1C Mark VIe Quad Core Controller ModuleGE IS420UCSCH1C Mark VIe Quad Core Controller Module
GE IS420UCSCH1C Mark VIe Quad Core Controller Module
GE IS420UCSCH1C Mark VIe Quad Core Controller Module
GE IS420UCSCH1C Mark VIe Quad Core Controller Module

GE IS420UCSCH1C Mark VIe Quad Core Controller Module


Only 10 left - Selling fast

PRODUCT SKU : IS420UCSCH1C

PRODUCT TYPE : CPU Processors

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The GE IS420UCSCH1C, also cataloged as the IS420UCSCH1C Quad Core Controller, operates as a dedicated hardware component for high-speed industrial control execution and model-specific firmware execution within GE Mark VIe IONet platforms.

Hardware Specifications

Parameter Specification
Model IS420UCSCH1C
Brand GE / GE Energy
Origin USA
Weight Approx. 46.8 oz (1.33 kg)
Dimensions H 6.61 in x D 5.90 in x W 2.17 in
Operating Temp -30 to +65 deg C (Storage: -40 to +85 deg C)
Power Consumption 18 VDC to 30 VDC Input Voltage
Processor 1.2 GHz AMD G-Series Quad-Core Microprocessor
Memory 4 GB DDR3-1333 SDRAM
Operating System QNX Neutrino Real-Time OS
Cooling Method Fanless Convection Cooled
Network Interface Dedicated IONet Ethernet Interfaces

Profinet / EtherNet/IP Deterministic Networks and I/O Density Scaling

The IS420UCSCH1C does not utilize a physical backplane rack for I/O module hosting. Instead, it interfaces directly across dedicated IONet Ethernet networks to exchange deterministic control data with distributed Mark VIe I/O packs. This architecture allows flexible I/O density scaling across standalone or redundant controller sets. In multi-controller configurations, all attached I/O networks simultaneously transmit input data to each active node, ensuring seamless failover and state synchronization without loss of process data during maintenance transitions or online firmware flash compatibility cycles.

Frequently Asked Questions

Q: Does the IS420UCSCH1C controller rely on internal batteries or hardware jumpers for startup configuration?

A: No. The IS420UCSCH1C requires no internal battery backup and features a jumperless hardware design, maintaining system settings directly in non-volatile flash memory.

Q: How does the IS420UCSCH1C maintain thermal stability without a cooling fan?

A: Heat generated by the 1.2 GHz quad-core processor is dissipated passively through natural convection cooling, eliminating mechanical fan failure points within the controller enclosure.

Field Installation Guidelines

  1. Fasten the IS420UCSCH1C directly to the designated enclosure mounting base using two mounting screws.
  2. Maintain a minimum clearance of 4.0 inches (101.6 mm) above and below the module frame to allow unrestricted natural air convection.
  3. Establish a direct earth ground link from the chassis grounding terminal to the panel ground bus bar.
  4. Wire 18 VDC to 30 VDC control power to the input terminals, verifying supply voltage tolerances before energizing.
  5. Connect RJ45 Ethernet cables from the dedicated IONet ports directly to the Mark VIe network switches, keeping signal lines isolated from high-voltage AC wiring.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Demystifying the DDE Protocol in Legacy Industrial Automation Systems

Demystifying the DDE Protocol in Legacy Industrial Automation Systems

Modern control systems rely heavily on seamless interprocess communication to exchange operational data between software programs. Microsoft first introduced the Dynamic Data Exchange (DDE) protocol in 1987 to enable real-time data sharing. In factory automation, DDE served as an early bridge between control software and Windows desktop applications. Therefore, understanding DDE mechanics provides crucial insights into how legacy industrial networks established software-level connectivity.

Read more
Demystifying CPU Communication Ports in Siemens PLC Architectures

Demystifying CPU Communication Ports in Siemens PLC Architectures

Industrial automation relies heavily on robust data exchange between devices. Without seamless connectivity, field instruments, network switches, human-machine interfaces, and programmable logic controllers cannot coordinate effectively. Therefore, understanding the various CPU communication ports available in Siemens hardware ensures efficient factory automation design and seamless system integration.

Read more
Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Industrial automation relies heavily on programmable logic controllers (PLCs) to manage complex manufacturing processes. Many engineers dive straight into programming without mastering the underlying architecture. However, understanding how a PLC CPU executes a program ensures reliable system design. Therefore, mastering the scan cycle optimizes both performance and troubleshooting in modern control systems.

Read more