Product Details
Configured for primary voltage routing in Mark VI control systems, the GE DS200TCPDG2B (DS200TCPD Power Distribution Module) provides direct physical execution of 125 VDC and 120/240 VAC power distribution across control cores and peripheral terminal boards.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | DS200TCPDG2B |
| Brand | General Electric |
| Origin | USA |
| Operating Temp | Standard industrial range |
| Power Consumption | N/A (Distribution unit) |
| Input Voltage | 125 VDC, 120/240 VAC |
Backplane Bus Communication and Deterministic Power Routing
The DS200TCPDG2B serves as the central hub for power management within the PD core, regulating the flow of 125 VDC to TCPS modules and TCEA boards. Deterministic power distribution is managed through integrated switches that allow for the independent isolation of individual control cores. The board facilitates 120/240 VAC supply for ignition transformers connected to DTBC terminal boards and provides monitored feedback to CTBA boards in core R5. Firmware flash compatibility is not applicable, as the board operates through fixed electrical pathways. Backplane bus communication velocity is maintained through direct-wired distribution, ensuring stable voltage levels for servo valve and solenoid output circuits.
Frequently Asked Questions
Q: How is the ground reference isolated when using external references?
A: The board includes the BJS hardware jumper specifically for this purpose. When the jumper is inserted, the ground reference is connected to external reference systems; when removed, the ground reference is isolated.
Q: Does this board require software configuration to manage core power distribution?
A: No. The DS200TCPDG2B does not support software configuration. Power management is executed solely through physical onboard switches for individual core shutdown and hardwired distribution paths.
Field Installation Guidelines
- Ensure the system is fully de-energized before mounting the board or adjusting power switches to prevent electrical shock and potential damage to the power distribution bus.
- Verify input voltages (125 VDC and 120/240 VAC) at the primary terminals prior to engaging the core-specific switches.
- Handle the board by its edges to prevent physical stress on the power distribution circuitry and components.
- Ensure the BJS jumper is configured correctly for the specific site grounding requirements before initialization, as improper jumper state can lead to ground loop interference.
Additional Information
- 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
- 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
- 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
- Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
- Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
- Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.































