Skip to content

What are you looking for?


You may also like

GE DS200UPSAG1AGD Mark V Series UC200 Power Supply BoardGE DS200UPSAG1AGD Mark V Series UC200 Power Supply BoardGE DS200UPSAG1AGD Mark V Series UC200 Power Supply Board
GE DS200UPSAG1AGD Mark V Series UC200 Power Supply Board
GE DS200UPSAG1AGD Mark V Series UC200 Power Supply Board
GE DS200UPSAG1AGD Mark V Series UC200 Power Supply Board

GE DS200UPSAG1AGD Mark V Series UC200 Power Supply Board


Only 10 left - Selling fast

PRODUCT SKU : DS200UPSAG1AGD

PRODUCT TYPE : Power Supply Board

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Product Overview

The DS200UPSAG1AGD functions as the primary UC200 Power Supply Board within the GE Speedtronic Mark V gas turbine control system. This critical component regulates power distribution for LAN circuit operations, ensuring stable voltage delivery to the control architecture. We provide this unit as 100% Brand New original equipment to maintain the integrity of your turbine’s mission-critical automation systems.

Technical Specifications

The DS200UPSAG1AGD integrates high-density power management components designed for heavy industrial cycles:

Feature Component Details
Manufacturer General Electric (GE)
Series Mark V Speedtronic
Board Type UC200 Power Supply / LAN Circuit Board
Circuit Protection Three (3) Integrated Fuses for Over-current Shielding
User Interface One (1) Reset Button & One (1) Status LED
Connectivity Three (3) 9-Pin Connectors
Energy Storage High-Voltage Capacitors for Current Regulation
Monitoring Integrated On-board Test Points

Engineering Advantages

  • Over-current Safeguarding: Three dedicated fuses protect internal circuitry from sudden current spikes, preventing cascading hardware failure in the Speedtronic rack.

  • Real-time Diagnostics: The on-board LED provides immediate visual confirmation of power status, while accessible test points allow engineers to verify voltage rails without dismantling the assembly.

  • Rapid System Recovery: The integrated reset button enables quick board initialization and fault clearing, reducing downtime during maintenance intervals.

  • Precision Energy Regulation: A robust array of capacitors stores and releases high-voltage current, smoothing out power fluctuations to protect sensitive LAN communication signals.

Installation & Safety Guidelines

The DS200UPSAG1AGD requires specific handling protocols to ensure technician safety and equipment longevity:

  1. Capacitor Discharge Time: High-voltage capacitors retain a significant charge even after system shutdown. You must wait a minimum of 30 seconds after disconnecting power before touching the board or its components.

  2. Fuse Verification: Before installation, inspect the three integrated fuses to ensure they meet the specific amperage requirements of your Mark V configuration.

  3. Port Security: Secure all three 9-pin connectors firmly to prevent intermittent signal loss in the LAN circuit.

FAQs

  • Is this DS200UPSAG1AGD unit brand new or refurbished?

    We supply this product as a 100% Brand New unit, ensuring it has never been deployed in an active system and carries the full original service life.

  • How do the on-board capacitors affect maintenance safety?

    The capacitors store high-voltage current during normal operation. While they pose no danger during active cycles, they remain energized for 30 seconds post-shutdown. Always use a voltmeter at the test points to confirm zero voltage before handling.

  • What is the primary function of the reset button?

    The reset button reinitializes the UC200 logic without requiring a full system power cycle, facilitating faster troubleshooting during communication errors on the LAN circuit.

  • Does this board include the 9-pin connectors?

    Yes, the DS200UPSAG1AGD comes equipped with three 9-pin headers soldered directly to the PCB for immediate integration into your existing Mark V wiring harness.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding SCADA vs. HMI: A Technical Guide for Industrial Automation

Understanding SCADA vs. HMI: A Technical Guide for Industrial Automation

In the world of factory automation, professionals often use the terms HMI and SCADA interchangeably. However, these systems serve distinct roles within a control hierarchy. Understanding their unique functions is vital for designing efficient industrial automation architectures.

Read more
Microcontroller vs. PLC: Choosing the Right Controller for Industrial Automation

Microcontroller vs. PLC: Choosing the Right Controller for Industrial Automation

Engineers have long sought the perfect balance between flexibility and reliability when controlling complex systems. Today, two primary technologies dominate the landscape: the Microcontroller and the Programmable Logic Controller (PLC). While both serve as the "brain" of a system, they cater to vastly different environments. Understanding their core differences is essential for designing efficient control systems.

Read more
Essential DCS Commissioning Steps for Industrial Plant Success

Essential DCS Commissioning Steps for Industrial Plant Success

DCS commissioning is the vital bridge between construction and production. This phase validates that industrial automation infrastructure meets its functional design, ensuring safety and long-term reliability. By following rigorous protocols, engineers successfully transition from hardware installation to live process control.

Read more