Skip to content

What are you looking for?


You may also like

Bently Nevada 3500/91-01-01-01 EGD Communication Gateway ModuleBently Nevada 3500/91-01-01-01 EGD Communication Gateway ModuleBently Nevada 3500/91-01-01-01 EGD Communication Gateway Module
Bently Nevada 3500/91-01-01-01 EGD Communication Gateway Module
Bently Nevada 3500/91-01-01-01 EGD Communication Gateway Module
Bently Nevada 3500/91-01-01-01 EGD Communication Gateway Module

Bently Nevada 3500/91-01-01-01 EGD Communication Gateway Module


Only 10 left - Selling fast

PRODUCT SKU : 3500/91-01-01-01

PRODUCT TYPE : Gateway Module

PRODUCT VENDOR : Bently Nevada


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Description

The Bently Nevada 3500/91-01-01-01 EGD Communication Gateway Module provides Ethernet-based data exchange between the 3500 Series machinery protection system and external platforms such as GE Mark VIe, DCS, and PLC systems.

Specifications

  • Manufacturer: Bently Nevada (Baker Hughes)

  • Origin: USA

  • Model: 3500/91-01-01-01

  • Type: EGD Communication Gateway Module

  • Function: Publishes monitored values and system status from the 3500 rack over Ethernet

  • Protocol: Ethernet Global Data (EGD)

  • Network Interface: 10/100 Mbps Ethernet port

  • Mounting: Rack-mounted within the 3500 Series system

  • Dimensions: 241.3 mm × 24.4 mm × 241.8 mm

  • Weight: 0.79 kg

  • Warranty: One-year manufacturer warranty

Features

  • Real-Time Data Transmission: Shares vibration, temperature, and system status data with external controllers

  • EGD Protocol Support: Ensures fast and reliable communication for industrial automation systems

  • System Integration: Seamlessly connects the 3500 rack to GE and third-party control platforms

  • High-Speed Networking: Supports 10/100 Mbps Ethernet for responsive performance

  • Compact Design: Rack-mounted form factor for efficient space usage

  • Industrial Reliability: Built for demanding environments in oil, gas, and power generation

  • Quick Deployment: In-stock and ready for global shipping

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
The Shift to Flexible IO Modules in Modern Industrial Automation

The Shift to Flexible IO Modules in Modern Industrial Automation

Traditional control systems rely on dedicated Input Output (IO) cards for industrial automation. Each conventional module processes a single signal type, such as Digital Input (DI), Digital Output (DO), Analog Input (AI), or Analog Output (AO). A standard 16-channel card accepts only one specific channel type across all ports. This inflexible hardware design often creates severe engineering bottlenecks during project execution. Engineers frequently must install entirely new cards to accommodate a single extra sensor. Consequently, late design changes increase control cabinet space requirements and drive up project costs.

Read more
DCS Commissioning Steps in Industrial Automation Projects

DCS Commissioning Steps in Industrial Automation Projects

Commissioning a Distributed Control System (DCS) represents a crucial milestone when deploying modern process automation infrastructure. Field engineers must execute systematic verification steps to transition complex control hardware from static installation to dynamic plant control. Proper commissioning ensures that controllers, I/O modules, network switches, and HMI software operate in strict compliance with engineering design specifications before introducing live process fluids.

Read more
PLC and DCS Control System Spares Strategy: Engineering Guidelines

PLC and DCS Control System Spares Strategy: Engineering Guidelines

Modern factory automation relies on high-speed fiber optic backbones to link distributed control systems across noise-intensive industrial environments. Unlike copper wiring, optical fibers transmit data via light pulses, making them completely immune to electromagnetic interference (EMI). Field engineers must master optical cable joining and fusion splicing techniques to guarantee low-loss data transmission across critical Programmable Logic Controller (PLC) and Distributed Control System (DCS) nodes.

Read more