Skip to content

What are you looking for?


You may also like

51202942-200 Honeywell Interface Cable Assembly51202942-200 Honeywell Interface Cable Assembly51202942-200 Honeywell Interface Cable Assembly
51202942-200 Honeywell Interface Cable Assembly
51202942-200 Honeywell Interface Cable Assembly
51202942-200 Honeywell Interface Cable Assembly

51202942-200 Honeywell Interface Cable Assembly


Only 10 left - Selling fast

PRODUCT SKU : 51202942-200

PRODUCT TYPE : Interface Cables

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for low-level analog signal interconnects in Honeywell Experion PKS platforms, the Honeywell 51202942-200 (51202942-200 Cable Assembly) provides direct physical/electrical execution. It links field termination assemblies (FTAs) to I/O processors, maintaining signal integrity under industrial electromagnetic interference.

Hardware Specifications

Parameter Specification
Model 51202942-200
Brand Honeywell
Origin USA / Certified Assembly Facility
Weight 0.45 kg (1.00 lbs)
Dimensions Standard Multi-Conductor Cable Harness Pitch
Operating Temp -20 to 70 deg C
Power Consumption Passive Component
Cable Type Multi-Conductor Interface Cable Assembly
System Compatibility Honeywell Experion PKS / High-Performance I/O
Jacket Material Flame-Retardant PVC

4-20 mA HART Loop Protocol & Channel-to-Channel Isolation

The 51202942-200 cable assembly maintains high signal fidelity across 4-20 mA HART loop protocol lines within Honeywell DCS system architectures. Designed with individually shielded twisted-pair wiring, the assembly minimizes crosstalk and channel-to-channel capacitive coupling. This shielding performance preserves analog measurement resolution and supports bi-directional HART digital frequency-shift keying (FSK) communications without packet loss across the I/O bus link.

Frequently Asked Questions

Q: Does installing the 51202942-200 cable require de-energizing the associated I/O module bus?

A: No, the cable assembly can be connected or disconnected while the backplane is powered, provided the connected field loop currents are managed within hot-swap limits.

Q: How is shield drain wire grounding handled on the 51202942-200 connector ends?

A: The cable assembly features integrated ground drain leads terminating at the connector shell to provide continuous 360-degree shielding to the cabinet ground bar.

Field Installation Guidelines

  1. Inspect the cable jacket, strain relief boots, and pin connectors for physical damage prior to installation.
  2. Maintain minimum cable bend radii of 8x outer diameter during routing inside marshalling panels.
  3. Align keyed connector housings with the target FTA card header to avoid pin bending.
  4. Route the cable separately from high-voltage AC power lines to minimize induced electrical noise.
  5. Secure drain wires directly to the system protective earth (PE) grounding rail.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more