Skip to content

What are you looking for?


You may also like

1785-BEM |Allen Bradley | PLC-5 Backup Communications Expansion Module1785-BEM |Allen Bradley | PLC-5 Backup Communications Expansion Module1785-BEM |Allen Bradley | PLC-5 Backup Communications Expansion Module
1785-BEM |Allen Bradley | PLC-5 Backup Communications Expansion Module
1785-BEM |Allen Bradley | PLC-5 Backup Communications Expansion Module
1785-BEM |Allen Bradley | PLC-5 Backup Communications Expansion Module

1785-BEM |Allen Bradley | PLC-5 Backup Communications Expansion Module


Only 10 left - Selling fast

PRODUCT SKU : 1785-BEM

PRODUCT TYPE : Communications Expansion Module

PRODUCT VENDOR : Allen-Bradley


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Product Overview

The Allen Bradley 1785-BEM functions as a dedicated Backup Communications Expansion Module for the PLC-5 platform. It provides the essential hardware layer for high-availability control systems by managing redundant communication paths between processors. This module ensures that your automation network remains operational even if a primary communication link fails. We supply this unit as 100% Brand New, delivering a factory-fresh solution for legacy system upgrades and critical spares inventory.

Technical Specifications

The 1785-BEM integrates seamlessly into the 1771 universal I/O chassis, drawing minimal power from the backplane.

Feature Specification
Manufacturer Allen Bradley (Rockwell Automation)
Part Number 1785-BEM
Product Line PLC-5
Module Type Communications Expansion (Backup)
Backplane Current 0.6 Amperes
Operating Voltage 5 VDC (via Backplane)
Weight 0.99 lbs (0.45 kg)
Category PLC Module/Rack Components

Engineering Advantages

  • Redundancy Management: The 1785-BEM enables the secondary processor in a "Hot Backup" configuration to synchronize its communication status with the primary controller. This synchronization allows for a near-bumpless transfer of control during hardware or network failures.

  • Low Thermal Impact: Drawing only 0.6 Amps at 5 VDC, the module generates negligible heat. This efficiency allows you to mount it in high-density 1771 chassis without compromising the thermal window of adjacent analog or specialty modules.

  • Seamless Backplane Integration: The module utilizes the standard 1771 slot architecture. It requires no external power wiring, as it pulls all necessary operating voltage directly from the chassis power supply, simplifying cable management in cramped enclosures.

  • Critical Link Restoration: By expanding the communication capabilities of the PLC-5 processor, the 1785-BEM provides a fail-safe mechanism for Remote I/O and DH+ (Data Highway Plus) links, preventing total system shutdowns in continuous process industries like oil and gas or water treatment.

FAQs

  • When does a system require the 1785-BEM module?

    You must install the 1785-BEM whenever you configure a PLC-5 system for redundant "Hot Backup" operation. It handles the specific communication exchange required to keep the standby processor's data tables updated with the primary processor's live values.

  • Can I install the 1785-BEM in any slot?

    Typically, you install the 1785-BEM in a slot immediately adjacent to the PLC-5 processor or in a designated slot defined by your redundancy hardware setup (such as a 1785-BCM backup module). Always refer to your specific redundancy firmware requirements for slot assignment.

  • Is this module compatible with all PLC-5 processors?

    The 1785-BEM supports standard PLC-5 processors that utilize the 1771 universal I/O chassis. However, verify that your processor firmware supports backup expansion functions before commissioning.

  • Does this brand new unit require any special configuration?

    As a 100% Brand New original unit, it arrives with factory-default settings. Configuration primarily occurs within the RSLogix 5 software environment and via the physical switch settings on the primary redundancy hardware (1785-BCM) that this expansion module supports.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Industrial control system deployments rely on structured signal distribution to bridge field instrumentation with central processing hardware. A marshalling cabinet serves as the vital intermediate connection point between heavy field home-run multi-pair cables and delicate input/output (I/O) modules housed inside Programmable Logic Controller (PLC) or Distributed Control System (DCS) enclosures. By segregating field cable terminations from control hardware, engineers maintain system flexibility, safeguard controller components, and streamline commissioning workflows.

Read more
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more