Skip to content

What are you looking for?


You may also like

ATA4D-00 S2 YOKOGAWA Terminal BlockATA4D-00 S2 YOKOGAWA Terminal BlockATA4D-00 S2 YOKOGAWA Terminal Block
ATA4D-00 S2 YOKOGAWA Terminal Block
ATA4D-00 S2 YOKOGAWA Terminal Block
ATA4D-00 S2 YOKOGAWA Terminal Block

ATA4D-00 S2 YOKOGAWA Terminal Block


Only 10 left - Selling fast

PRODUCT SKU : ATA4D-00 S2

PRODUCT TYPE : Terminal Blocks

PRODUCT VENDOR : Yokogawa


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The YOKOGAWA ATA4D-00 S2, also cataloged as the ATA4D Terminal Block, operates as a dedicated hardware component for dual-redundant field signal termination within Yokogawa Centum VP FIO platforms.

Hardware Specifications

Parameter Specification
Model ATA4D-00 S2
Brand YOKOGAWA
Origin Japan
Weight 0.3 kg
Dimensions 12.7 cm x 7.2 cm x 6.5 cm
Operating Temp -20 to +60 deg C
Power Consumption Passive field termination (0 W)
Channel Capacity 16 analog input channels
Connection Type Dual-redundant pressure clamp
Compatible Modules AAI141, AAI143 Analog Input Series

Channel-to-Channel Isolation & Dual-Redundant Signal Paths

The ATA4D-00 S2 terminal block maintains signal integrity across 16 field transmitter channels by integrating dual-redundant wiring paths directly onto its internal PCB backplane interface. Designed for seamless integration with FIO analog input modules, it provides channel-to-channel isolation and galvanic separation to shield sensitive processing circuits from field ground loops and electrical transients. The pressure clamp design ensures stable physical connection under industrial vibration while supporting 4-20 mA HART loop signal routing without attenuation.

Frequently Asked Questions

Q: Does the ATA4D-00 S2 require active power from the FIO baseplate to function?

A: No, the terminal block acts as a passive field connection interface, routing power and signals directly between the field instrumentation and the primary analog input module.

Q: What wire gauge is supported by the pressure clamp terminals on the ATA4D-00 S2?

A: The pressure clamp terminals accommodate solid or stranded copper field conductors ranging from 0.2 to 2.5 mm2 (AWG 24 to 12) without needing terminal crimping tools.

Field Installation Guidelines

  1. Confirm the main FIO module rack is isolated or follow local hot-swap authorization procedures prior to attaching the terminal block.
  2. Align the rear connector pins of the ATA4D-00 S2 precisely with the mating slot on the FIO baseplate to prevent pin bending.
  3. Tighten the top and bottom captive securing screws to anchor the terminal block firmly against vibration.
  4. Strip field conductor insulation to 8-10 mm, insert the bare wire into the pressure clamp, and release the tension lever to lock the wire in place.
  5. Secure all field cable shielding to the dedicated cabinet system ground bar to prevent noise coupling across 4-20 mA analog input loops.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Transforming Shop Floor Data into Actionable Insights: A Deep Dive into MES

Transforming Shop Floor Data into Actionable Insights: A Deep Dive into MES

Manufacturing Execution Systems serve as the digital backbone of modern factory floors. Positioned at Level 3 of the ISA-95 automation pyramid, MES links enterprise resource planning with real-time shop floor control systems. Today, industrial operators rely on MES software to bridge operational strategy with physical production execution.

Read more
Managed Switch vs. Unmanaged Switch: Industrial Ethernet Architecture

Managed Switch vs. Unmanaged Switch: Industrial Ethernet Architecture

Industrial Ethernet forms the backbone of factory automation. Selecting the right switch architecture determines system uptime, data throughput, and OT cyber resilience. This technical guide evaluates managed vs. unmanaged switches, analyzing operational differences, security controls, and selection criteria.
Read more
Hot Standby vs. Cold Standby Redundancy in Industrial Automation

Hot Standby vs. Cold Standby Redundancy in Industrial Automation

System availability determines process safety and productivity in industrial automation. Control engineers deploy redundancy to eliminate single points of failure. This technical guide evaluates Hot Standby vs. Cold Standby architectures, comparing failover speeds, memory sync, cost trade-offs, and field selection criteria.

Read more