Skip to content

What are you looking for?


You may also like

Honeywell FC-BN-1608 Sensor Converter ModuleHoneywell FC-BN-1608 Sensor Converter ModuleHoneywell FC-BN-1608 Sensor Converter Module
Honeywell FC-BN-1608 Sensor Converter Module
Honeywell FC-BN-1608 Sensor Converter Module
Honeywell FC-BN-1608 Sensor Converter Module

Honeywell FC-BN-1608 Sensor Converter Module


Only 10 left - Selling fast

PRODUCT SKU : FS-BN-1608

PRODUCT TYPE : Signal Converter Modules

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The Honeywell FC-BN-1608, also cataloged as the FC-BN-1608 Sensor Converter Module, operates as a dedicated hardware component for field sensor signal conditioning and backplane bus conversion within Honeywell Safety Manager platforms.

Hardware Specifications

Parameter Specification
Model FC-BN-1608
Brand Honeywell
Origin Netherlands
Weight 0.85 kg
Dimensions Standard Safety Manager single-slot card size
Operating Temp -0 to 60 deg C
Power Consumption 24 VDC backplane bus supplied
Module Type Sensor Signal Converter Module
Channels 16-channel sensor interface
System Compatibility Honeywell Safety Manager / FSC System
Signal Conversion Field sensor inputs to internal bus logic level
Galvanic Isolation System-to-field and channel-to-channel isolated

Channel-to-Channel Isolation and Sensor Loop Integrity

The FC-BN-1608 sensor converter module processes 16 field sensor channels, converting field-level input signals into digital logic signals for processing by central safety logic solvers. High-grade galvanic isolation circuitry shields backplane communications from field-side voltage surges, common-mode ground loops, and electrical noise. By preserving channel-to-channel isolation, the card prevents field faults on individual sensor circuits from impacting adjacent process channels, supporting clean signal acquisition for standard 4-20 mA HART loop protocol transmitters and discrete sensing devices.

Frequently Asked Questions

Q: How does the FC-BN-1608 protect system logic cards against high-voltage field spikes?

A: Integrated optocouplers and galvanic isolation barriers isolate the 16 field sensor inputs from the backplane, suppressing common-mode transients up to 1.5 kV.

Q: Is live hot-swapping supported for the FC-BN-1608 module in an active Safety Manager rack?

A: Hot-swapping is permitted provided the slot is part of a redundant pair or safety bypass overrides are active according to site plant safety procedures.

Q: What power rail supplies the internal logic and channel conditioning circuits?

A: The module draws power directly from the 24 VDC rack power distribution backplane via its rear edge connector.

Field Installation Guidelines

  1. Verify system bypass or power-down conditions before inserting the module into its designated rack slot.
  2. Align the top and bottom edge card guides with the subrack rails and push the module firmly into the backplane socket.
  3. Tighten the top and bottom module retaining screws to establish low-impedance grounding contact with the subrack chassis frame.
  4. Route field sensor cabling through segregated low-voltage instrument wireways away from AC power lines and inverter circuits.
  5. Connect cable shield drains directly to the cabinet instrumentation earth bus bar to ensure effective noise rejection.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more