Skip to content

What are you looking for?


You may also like

SR511 3BSE000863R0001 | ABB | Power Supply Regulator ModuleSR511 3BSE000863R0001 | ABB | Power Supply Regulator ModuleSR511 3BSE000863R0001 | ABB | Power Supply Regulator Module
SR511 3BSE000863R0001 | ABB | Power Supply Regulator Module
SR511 3BSE000863R0001 | ABB | Power Supply Regulator Module
SR511 3BSE000863R0001 | ABB | Power Supply Regulator Module

SR511 3BSE000863R0001 | ABB | Power Supply Regulator Module


Only 10 left - Selling fast

PRODUCT SKU : SR511 3BSE000863R0001

PRODUCT TYPE : Power Supply Modules

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The ABB SR511 3BSE000863R0001, also cataloged as the SR511 Power Supply Modules, operates as a dedicated hardware component for internal DC voltage regulation and logic power distribution within ABB Advant Master system subracks.

Hardware Specifications

Parameter Specification
Model SR511
Order Code 3BSE000863R0001
Brand ABB
Origin Sweden
Product Type Power Supply Modules
Input Voltage 24 VDC
Output Voltage 5 VDC
Dimensions 117 mm x 54 mm x 243 mm
Weight 1.6 kg
Operating Temp 0 to 55 deg C
Power Consumption Internal conversion loss profile
RoHS Compliance Not RoHS Compliant
WEEE Category 5. Small Equipment (No External Dimension More Than 50 cm)

Backplane Bus Power Integration & I/O Density Scaling

The ABB SR511 regulator converts an incoming primary 24 VDC power rail into a regulated 5 VDC logic supply distributed across the subrack backplane bus. This voltage stabilization maintains signal integrity and logic bus execution across dense I/O module configurations. Firmware flash compatibility across system racks ensures real-time power monitoring integration with central controller logic.

Frequently Asked Questions

Q: What function does the SR511 regulator execute within the system rack?

A: The module regulates primary 24 VDC field or cabinet power down to a stabilized 5 VDC output to energize backplane logic circuits and I/O communication cards.

Q: Is hot-swapping permitted for the SR511 module during active rack operation?

A: Input power to the subrack slot must be de-energized before removing or installing the regulator card to avoid arcing and voltage instability across the backplane bus.

Field Installation Guidelines

  1. De-energize the main 24 VDC supply before inserting the SR511 regulator into the subrack chassis slot.
  2. Align the board edges with the guide channels and slide the module in until the rear power connectors engage fully with the backplane header.
  3. Tighten the panel retaining screws at the top and bottom to lock the unit in place and establish chassis ground connection.
  4. Maintain clear thermal ventilation clearance around the top and bottom heatsink pathways of the module frame.
  5. Verify correct supply wiring polarity before restoring operating power to the subrack cabinet.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more