Skip to content

What are you looking for?


You may also like

P0926KL Foxboro Power Supply Output CableP0926KL Foxboro Power Supply Output CableP0926KL Foxboro Power Supply Output Cable
P0926KL Foxboro Power Supply Output Cable
P0926KL Foxboro Power Supply Output Cable
P0926KL Foxboro Power Supply Output Cable

P0926KL Foxboro Power Supply Output Cable


Only 10 left - Selling fast

PRODUCT SKU : P0926KL

PRODUCT TYPE : Power Cables and Harnesses

PRODUCT VENDOR : Foxboro


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for power distribution within Foxboro I/A Series control enclosures, the Foxboro P0926KL (P0926KL Output Cable) provides direct physical/electrical execution for delivering regulated DC power from system power supplies to baseplate distribution rails. Featuring a 3-conductor 18 AWG layout spanning 1 meter in length, it routes primary supply voltages to maintain system operation.

Hardware Specifications

Parameter Specification
Model P0926KL
Brand Foxboro
Origin USA
Weight 0.30 kg (0.66 lbs)
Dimensions 1 meter length
Operating Temp -20 deg C to +70 deg C
Power Consumption Passive wiring assembly (0 W)
Cable Type 3-conductor (3/C) power cable
Wire Gauge 18 AWG
Voltage Rating 300 V
Application Power supply output cable

Channel-to-Channel Isolation and Loop Protocol Connectivity

The Foxboro P0926KL power assembly incorporates high-dielectric insulation barriers across its 18 AWG conductors to maintain physical separation between supply lines and backplane communication paths. This construction mitigates voltage ripple and suppresses electromagnetic noise coupling into nearby 4-20 mA HART loop protocol field channels, preventing cold junction compensation (CJC) offsets on adjacent temperature input modules.

Frequently Asked Questions

Q: What is the primary functional role of the P0926KL cable?

A: The P0926KL routes regulated DC output power from Foxboro system power supply units to baseplates or power distribution modules.

Q: Can the P0926KL cable be disconnected while the power supply is energized?

A: No, de-energize the power supply module before disconnecting the cable assembly to prevent electrical arcing and terminal degradation.

Field Installation Guidelines

Ensure the main supply breaker to the power module is locked out prior to installing or servicing the P0926KL cable assembly. Inspect the 3-conductor wire terminations and keyway connectors for proper pin alignment before attachment.

Push the cable connector firmly into the mating power supply output socket until locking tabs click into place. Route the 1 meter cable through dedicated power wiring ducts, keeping power leads isolated from low-voltage instrument signal wiring. Verify that all cabinet earth ground connections are secure and that conduit connections retain a minimum of 5 full threads of engagement on NPT fittings.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more