Skip to content

What are you looking for?


You may also like

2MLF-AC4H Honeywell MasterLogic-200 Analog Input Module2MLF-AC4H Honeywell MasterLogic-200 Analog Input Module2MLF-AC4H Honeywell MasterLogic-200 Analog Input Module
2MLF-AC4H Honeywell MasterLogic-200 Analog Input Module
2MLF-AC4H Honeywell MasterLogic-200 Analog Input Module
2MLF-AC4H Honeywell MasterLogic-200 Analog Input Module

2MLF-AC4H Honeywell MasterLogic-200 Analog Input Module


Only 10 left - Selling fast

PRODUCT SKU : 2MLF-AC4H

PRODUCT TYPE : Analog Input Modules

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-speed signal processing and transmitter loop feedback in MasterLogic-200 platforms, the Honeywell 2MLF-AC4H (2MLF-AC4H Analog Input Module) provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model 2MLF-AC4H
Brand Honeywell
Origin South Korea
Operating Temp 0 to 55 deg C
Power Consumption Backplane 5 VDC internal logic supply load
Input Channels 4 analog input channels
Signal Processing Analog signal acquisition for process instrumentation
Communication Protocol 4-20 mA HART loop protocol
Protective Coating Conformal coating for industrial environment resilience

Process Control Integration & HART Communication

The 2MLF-AC4H analog input module executes real-time digital and analog signal acquisition across 4 dedicated field input channels. Operating on standard 4-20 mA HART loop protocol architectures, the board provides digital frequency-shift keying (FSK) signal decoding modulated over the primary analog current loop. Integrated channel-to-channel isolation safeguards central logic components from common-mode voltage field spikes, while the conformal coating layer prevents board contamination in corrosive environments.

Frequently Asked Questions

Q: Does the 2MLF-AC4H support HART protocol pass-through for field instrument management?

A: Yes, the module processes standard 4-20 mA analog signals while decoding digital HART protocol signals for device parameterization and diagnostics.

Q: What environmental protection is provided on the circuit board assembly?

A: The module features protective conformal coating across electronic assemblies to protect against airborne contaminants, moisture, and mild corrosive agents.

Q: How many analog field devices can be connected to a single 2MLF-AC4H module?

A: Up to 4 individual analog transmitters or HART field instruments can be terminated across its 4 input channels.

Field Installation Guidelines

  1. De-energize the PLC rack backplane power supply before inserting or extracting the 2MLF-AC4H module from its rack slot.
  2. Verify that field wiring for 4-20 mA loop instruments is routed using twisted-pair shielded conductors to maintain HART communication integrity.
  3. Ground wire shielding at a single point on the enclosure ground plane to eliminate ground loop currents across non-isolated signal returns.
  4. Align module base connectors carefully with the chassis backplane guide rails and press firmly until retention clips snap fully shut.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more