Skip to content

What are you looking for?


You may also like

RM7890B1014/U | Honeywell | Burner Control RelayRM7890B1014/U | Honeywell | Burner Control RelayRM7890B1014/U | Honeywell | Burner Control Relay
RM7890B1014/U | Honeywell | Burner Control Relay
RM7890B1014/U | Honeywell | Burner Control Relay
RM7890B1014/U | Honeywell | Burner Control Relay

RM7890B1014/U | Honeywell | Burner Control Relay


Only 10 left - Selling fast

PRODUCT SKU : RM7890B1014/U

PRODUCT TYPE : Burner Control Relays

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for burner management and safety sequencing in single burner combustion systems, the Honeywell RM7890B1014/U (RM7890B1014/U Burner Control Relay) provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model RM7890B1014/U
Brand Honeywell
Origin Standard Industrial Manufacturing
Weight 0.8 kg
Dimensions Standard 7800 Series plug-in module profile
Operating Temp -40 deg C to +60 deg C (-40 deg F to +140 deg F)
Power Consumption Max 10 W
Input Voltage 120 VAC (+10%, -15%), 50/60 Hz
Output Contacts 2 SPDT relays
Flame Establishing Period Selectable 4 or 10 seconds (intermittent pilot)

Channel-To-Channel Isolation And Loop Protocol Integrity

The module integrates specialized flame amplifier inputs compatible with R7847, R7848, R7849, R7851, R7861, and R7886 sensors, maintaining strict electrical isolation between high-voltage combustion interlocks and low-voltage system logic. It supports data communication bus modules and PC interface protocols while providing galvanic separation to protect burner management networks from electromagnetic interference and ground potential shifts. Cold junction compensation (CJC) and internal nonvolatile memory safeguard sequence tracking and fault history retention during transient power losses.

Frequently Asked Questions

Q: Can the RM7890B1014/U burner control relay be hot-swapped while the burner management panel is energized?

A: No. Main electrical power and 120 VAC supply lines must be completely isolated and locked out prior to removing or inserting the module on its Q7800 subbase to prevent internal component damage or accidental ignition staging.

Q: How is the flame establishing period configured on this module?

A: The flame establishing period is selectable for either 4 seconds or 10 seconds via internal hardware jumper settings or configuration tools prior to final system commissioning.

Field Installation Guidelines

  • Ensure all primary 120 VAC power feeds and burner interlock circuits are locked out and tagged out before handling the unit.
  • Mount the module securely onto a compatible Q7800A or Q7800B universal wiring subbase, ensuring all plug-in pin connectors seat fully without binding.
  • Verify correct wiring of input power terminals and ensure flame detector signal leads maintain proper shielding against high-voltage ignition interference.
  • Test system sequencing, pilot flame establishing intervals, and safety shut-off valve response via manual burner startup checks before returning the equipment to operational service.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Comparing PID and Model Predictive Control (MPC) in Industrial Automation

Comparing PID and Model Predictive Control (MPC) in Industrial Automation

Advanced process control strategies remain fundamental for maintaining optimal plant efficiency and product quality. Therefore, control engineers frequently evaluate whether a traditional Proportional-Integral-Derivative (PID) algorithm or a Model Predictive Control (MPC) strategy suits a given application. In my 15 years of commissioning distributed control systems (DCS) and factory automation networks, I have tuned thousands of PID loops while deploying complex MPC packages on multivariable distillation columns. Below, I break down the core operational differences between these two foundational control methodologies.

Read more
Mastering Time Synchronization in Industrial Automation Applications

Mastering Time Synchronization in Industrial Automation Applications

Precise time synchronization remains vital for modern industrial automation, distributed control systems (DCS), and power protection networks. Therefore, control engineers must maintain uniform clocks across all controllers, human-machine interfaces (HMIs), and supervisory stations. In my 15 years of commissioning complex industrial automation projects, I have frequently investigated root-cause failures where misaligned timestamps obscured the true sequence of events. Below, I break down the core time synchronization protocols and methods essential for reliable factory automation.

Read more
Designing Robust SCADA Systems for Electrical Substation Automation

Designing Robust SCADA Systems for Electrical Substation Automation

Electrical substation automation requires rigorous engineering standards to guarantee uninterrupted power distribution and grid stability. Therefore, control engineers must design supervisory control and data acquisition (SCADA) architectures with absolute precision. In my 15 years of commissioning power protection and substation automation systems, I have witnessed how meticulous SCADA design prevents catastrophic grid failures. Below, I outline the critical engineering practices required to build reliable substation SCADA solutions.

Read more