Skip to content

What are you looking for?


You may also like

Honeywell 8U-PWSP01-CN Series 8 Power Supply ModuleHoneywell 8U-PWSP01-CN Series 8 Power Supply ModuleHoneywell 8U-PWSP01-CN Series 8 Power Supply Module
Honeywell 8U-PWSP01-CN Series 8 Power Supply Module
Honeywell 8U-PWSP01-CN Series 8 Power Supply Module
Honeywell 8U-PWSP01-CN Series 8 Power Supply Module

Honeywell 8U-PWSP01-CN Series 8 Power Supply Module


Only 10 left - Selling fast

PRODUCT SKU : 8U-PWSP01-CN

PRODUCT TYPE : Power Supply Modules

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The Honeywell 8U-PWSP01-CN, also cataloged as the 8U-PWSP01-CN Power Supply Module, operates as a dedicated hardware component for regulated system bus voltage delivery within Honeywell Experion PKS Series 8 platforms.

Hardware Specifications

Parameter Specification
Model 8U-PWSP01-CN
Brand Honeywell
Origin USA
Weight 0.4 kg
Dimensions 7 cm x 14 cm x 14.5 cm
Operating Temp -25 deg C to +70 deg C
Power Consumption 100-240 VAC / VDC input
Output Voltage 24 VDC
Output Current 20 A
Voltage Regulation +/-0.5%
Isolation 2000 VAC
Redundancy Supported
Thermal Monitoring Six internal temperature sensors

Galvanic Isolation & Voltage Regulation Profiles

The module converts wide-range AC or DC input power into a tightly regulated 24 VDC power rail delivering up to 20 A to backplane I/O channels. Internal galvanic isolation rated at 2000 VAC prevents line transients and noise from coupling onto the internal DC distribution bus. Integrated circuitry maintains output regulation within +/-0.5% across dynamic load steps. Six internal thermal sensors continuously monitor operating states, providing contact signaling and status indication to protect against over-temperature events.

Frequently Asked Questions

Q: Does the 8U-PWSP01-CN support redundant power configurations on the Series 8 rack carrier?

A: Yes, the module supports redundant parallel operation to allow uninterrupted 24 VDC system power delivery during a single supply failure.

Q: What input power sources are compatible with the primary terminals?

A: The internal switching power circuit accepts an input range of 100-240 VAC or VDC.

Q: What isolation level exists between input power and system ground?

A: The hardware architecture provides 2000 VAC galvanic isolation between input power terminals and the internal control logic circuits.

Field Installation Guidelines

  1. Ensure the AC/DC main line circuit breaker is de-energized prior to seating or unseating the 8U-PWSP01-CN power module in the Series 8 rack slot.
  2. Verify that input line, neutral/DC potential, and protective earth (PE) wires are fully secured to terminal connections before applying power.
  3. Establish a direct low-impedance ground connection from the rack chassis grounding stud to the main enclosure ground bar.
  4. Maintain proper vertical clearance above and below the module chassis to allow natural air circulation across the heat sink surfaces.
  5. Confirm that total continuous 24 VDC load currents do not exceed the 20 A maximum rating under peak ambient operating conditions up to +70 deg C.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more