Skip to content

What are you looking for?


You may also like

Honeywell 8U-PAONA1 Series 8 Analog Output ModuleHoneywell 8U-PAONA1 Series 8 Analog Output ModuleHoneywell 8U-PAONA1 Series 8 Analog Output Module
Honeywell 8U-PAONA1 Series 8 Analog Output Module
Honeywell 8U-PAONA1 Series 8 Analog Output Module
Honeywell 8U-PAONA1 Series 8 Analog Output Module

Honeywell 8U-PAONA1 Series 8 Analog Output Module


Only 10 left - Selling fast

PRODUCT SKU : 8U-PAONA1

PRODUCT TYPE : Analog Output Modules

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The Honeywell 8U-PAONA1, also cataloged as the 8U-PAONA1 Analog Output Modules, operates as a dedicated hardware component for 16-channel current loop signal generation within Honeywell Experion PKS control system platforms.

Hardware Specifications

Parameter Specification
Model 8U-PAONA1
Brand Honeywell
Origin USA
Operating Temp 0 deg C to 60 deg C
Power Consumption 190 mA at 24 VDC
Output Channels 16
Signal Type 4-20 mA Analog Current
Output Range 2.9 mA to 21.1 mA
Resolution +/- 0.05% of full scale
Calibrated Accuracy +/- 0.2% of full scale at 25 deg C
Load Resistance 50 to 800 Ohm
Output Ripple 100 mV peak-to-peak (at 250 Ohm load)
Response Time 80 ms (to 1% of final value)
Redundancy Switchover 10 ms maximum

4-20 mA HART Loop Protocol and Channel-to-Channel Isolation

The module executes high-resolution digital-to-analog conversion across 16 independent output channels, transmitting 4-20 mA signals to final control elements. Channel-to-channel isolation and low-ripple circuit topology prevent cross-talk and buffer backplane logic against field-side electrical noise. The redundancy-ready architecture guarantees bumpless switchover with a maximum output gap of 10 ms, maintaining continuous command loops during controller transition events.

Frequently Asked Questions

Q: Does the 8U-PAONA1 support online module replacement while the system is energized?

A: Yes, the hardware supports insertion and removal under power (hot-swapping) to allow maintenance without interrupting system operational power.

Q: What is the maximum signal interruption time during a redundant controller switchover?

A: The module architecture limits output switchover gaps to a maximum of 10 ms during redundant system failover events.

Q: What load resistance constraints apply to the 4-20 mA current loops?

A: The output driver stages are engineered to operate into field loop load resistances between 50 Ohm and 800 Ohm.

Field Installation Guidelines

  1. Align the module with the designated slot on the Experion PKS rack carrier and seat it firmly until the retention latches engage.
  2. Verify that the system chassis and enclosure mounting rails are bonded to Earth ground to suppress high-frequency EMI/RFI noise.
  3. Route 4-20 mA signal runs using shielded twisted-pair conductors, keeping field lines separated from high-voltage AC cables.
  4. Terminate signal shields at a single chassis grounding point to prevent circulating ground currents across field loops.
  5. Ensure cabinet ventilation slots remain unobstructed to facilitate passive convection cooling across the 0 deg C to 60 deg C operating range.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more