Skip to content

What are you looking for?


You may also like

Woodward 9905-760 LinkNet Termination ModuleWoodward 9905-760 LinkNet Termination ModuleWoodward 9905-760 LinkNet Termination Module
Woodward 9905-760 LinkNet Termination Module
Woodward 9905-760 LinkNet Termination Module
Woodward 9905-760 LinkNet Termination Module

Woodward 9905-760 LinkNet Termination Module


Only 10 left - Selling fast

PRODUCT SKU : 9905-760

PRODUCT TYPE : Digital Synchronizer Modules

PRODUCT VENDOR : Woodward


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for power system synchronization in LinkNet network architectures, the Woodward 9905-760 (9905-760 Digital Synchronizer and Load Control Module) provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model 9905-760
Brand Woodward
Origin USA
Weight Approx. 0.5 kg
Dimensions 16 cm x 16 cm x 12 cm
Operating Temp Industrial grade specification
Power Consumption Dependent on control load
Synchronizing Logic Microprocessor-based frequency and phase angle monitoring

Actuator Loop Feedback Response

The 9905-760 manages power system stability by monitoring generator frequency and phase angle via integrated microprocessor logic. It generates precise control signals to adjust generator output, ensuring matching parameters prior to grid connection. During parallel operation, the module executes real-time load demand adjustments, regulating power output to maintain system voltage and frequency setpoints. The internal architecture includes thermal heat sink dissipation profiles to ensure operational stability during continuous load-balancing cycles in varying ambient conditions.

Frequently Asked Questions

Q: Can the 9905-760 be switched between automatic and manual modes during operation?

A: Yes, the module supports both automatic and manual operating modes. Mode transition should be performed according to the system's control logic to prevent abrupt changes in generator frequency or phase angle.

Q: Is this module compatible with other Woodward LinkNet series hardware?

A: The 9905-760 is designed for integration within LinkNet architectures. Ensure that firmware revisions across all connected LinkNet modules are compatible to maintain communication integrity.

Field Installation Guidelines

  1. Ensure the control cabinet is de-energized prior to mounting the module to prevent electrical damage to the communication bus.
  2. Verify that the physical dimensions (16 cm x 16 cm x 12 cm) are accommodated by the enclosure clearance requirements.
  3. Terminate all signal wiring according to the provided schematic to ensure accurate measurement of generator frequency and phase angle.
  4. Utilize shielded cabling for control signals to minimize electromagnetic interference that could affect the microprocessor's synchronization precision.
  5. Secure the module to the mounting plate using appropriate hardware to maintain resistance against vibrations typical of engine-driven generator environments.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more
Industrial Networking Essentials: Demystifying Hubs, Switches, and Routers in Control Systems

Industrial Networking Essentials: Demystifying Hubs, Switches, and Routers in Control Systems

Industrial automation relies heavily on robust networking infrastructure to connect programmable logic controllers (PLCs), distributed control systems (DCS), and human-machine interfaces (HMIs). Modern factory automation environments generate vast amounts of real-time operational data across deterministic networks. Understanding the structural differences between hubs, switches, and routers ensures optimal traffic segmentation, minimizes latency, and maintains high network availability.

Read more
Safety Relays in Industrial Automation: Fundamentals, Design Standards, and Fail-Safe Architecture

Safety Relays in Industrial Automation: Fundamentals, Design Standards, and Fail-Safe Architecture

Safety relays form the bedrock of functional safety in modern factory automation, preventing catastrophic equipment failure and protecting plant personnel. While standard electromechanical relays handle basic load switching, they lack the redundant diagnostics required for high-risk industrial environments. Modern industrial automation platforms—including programmable logic controllers (PLCs) and distributed control systems (DCS)—rely on specialized safety relays to monitor field devices and isolate hazards instantly.

Read more