Skip to content

What are you looking for?


You may also like

KL3101X1-LS1 DeltaV Process Controller Module | EmersonKL3101X1-LS1 DeltaV Process Controller Module | EmersonKL3101X1-LS1 DeltaV Process Controller Module | Emerson
KL3101X1-LS1 DeltaV Process Controller Module | Emerson
KL3101X1-LS1 DeltaV Process Controller Module | Emerson
KL3101X1-LS1 DeltaV Process Controller Module | Emerson

KL3101X1-LS1 DeltaV Process Controller Module | Emerson


Only 10 left - Selling fast

PRODUCT SKU : KL3101X1-LS1

PRODUCT TYPE : Analog Input Module

PRODUCT VENDOR : EMERSON


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-density analog input signal processing in DeltaV electronic marshalling subsystems, the Emerson KL3101X1-LS1 (KL3101X1-LS1 Intrinsically Safe Analog Input Module) provides direct physical/electrical execution. This hardware component processes 4-20 mA current loops from field instrumentation located in hazardous areas, managing signal barrier isolation and digitizing field variables directly on the distributed peripheral bus.

Hardware Specifications

Parameter Specification
Model KL3101X1-LS1
Brand Emerson
Origin U.S.A.
Weight 0.08 kg
Dimensions Standard CHARM module footprint slot width
Operating Temp -40 deg C to +70 deg C
Power Consumption +6.3 VDC at 0 mA (CHARM Bus), +24 VDC at 60 mA (Field Circuit)
Signal Input Range 4-20 mA loop current field variables
Embedded Protocol HART pass-through digital modulation data
Shock Resistance 10g 1/2 sine wave for 11 ms
Vibration Resistance 1 mm peak-to-peak (2 to 13.2 Hz); 0.7g (13.2 to 150 Hz)
Airborne Contaminants Class G3 harsh environment compliance
Relative Humidity 5% to 95% non-condensing

HART Pass-Through and Channel-To-Channel Isolation

Mechanical execution of this terminal-mounted CHARM module relies on dedicated galvanic separation layers to ensure process loop signal integrity. The unit incorporates a 4-20 mA HART loop protocol layer, which enables real-time extraction of secondary and tertiary variables from smart field instruments without disturbing the analog process signal. Integrated galvanic channel-to-channel isolation restricts ground fault propagation across adjacent monitoring tracks, ensuring that an open circuit or transient electrical spike on one loop does not disrupt neighboring process data blocks.

Frequently Asked Questions

Q: Does the module support hot-swap insertion while the DeltaV marshalling baseplate is powered?

A: Yes. The module is engineered for live insertion and removal under power. Internal current-limiting circuitry prevents electronic components from generating diagnostic disruptions or hardware trips on adjoining operational CHARM tracks during a swap procedure.

Q: How does the field power source differ from the primary CHARM bus allocation?

A: The CHARM bus uses a local +6.3 VDC link purely for digital communications backplane interface logic, consuming 0 mA from the signal track. The analog loop itself is powered separately by a dedicated +24 VDC field circuit rated at 60 mA maximum to drive the field instrument.

Field Installation Guidelines

  • Baseplate Slot Insertion: Align the rear terminal guides of the CHARM module perpendicularly with the designated baseplate receptor. Press downward until the dual mechanical retention latches click into place to prevent erratic terminal contact.

  • Intrinsically Safe Wiring Separation: All 4-20 mA hazardous-area wiring must be routed through segregated blue wiring ducts. Maintain a minimum distance of 50 mm between intrinsically safe current loops and non-intrinsically safe power infrastructure.

  • Shield Grounding Strategy: Terminate the cable shields at the carrier grounding bar assembly only. A single-point grounding layout must be verified at the marshalling cabinet to eliminate ground-loop induced currents on the 4-20 mA process variable tracking lines.

  • Environmental Enclosure Parameters: For locations with Class G3 airborne contaminant profiles, the marshalling enclosure must maintain a positive-pressure air flow and keep relative humidity below the 95% threshold to eliminate condensation on active terminal contacts.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Implementing FIFO and LIFO Data Sequencing in PLC Programming

Implementing FIFO and LIFO Data Sequencing in PLC Programming

Data management serves as a cornerstone of modern industrial automation. Whether tracking materials on a conveyor or managing batch sequences in a process, engineers frequently rely on sequential logic. Two primary structures—First-In-First-Out (FIFO) and Last-In-First-Out (LIFO)—form the bedrock of this data handling. Mastering these blocks allows programmers to optimize complex machine operations efficiently.

Read more
Evolving SCADA System Architectures in Industrial Automation

Evolving SCADA System Architectures in Industrial Automation

A robust Supervisory Control and Data Acquisition (SCADA) system serves as the heartbeat of modern industrial operations. Understanding SCADA system architecture is vital for engineers designing efficient control systems. These architectures have evolved from isolated, monolithic structures to highly interconnected, networked ecosystems. Choosing the right design requires balancing data visibility, processing power, and long-term scalability requirements.

Read more
Choosing the Right Controller: PLC vs. Motion Controller in Industrial Automation

Choosing the Right Controller: PLC vs. Motion Controller in Industrial Automation

Selecting the optimal control architecture is a foundational decision in industrial automation. Engineers must frequently choose between a Programmable Logic Controller (PLC) and a dedicated Motion Controller. While both systems manage machinery, their underlying design philosophies differ significantly, impacting performance, scalability, and system integration.

Read more